ELE10-02067
| ELE-Aging Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 4:06:46 PM | | CANC |
|
|
|
ELE13-01998
| ELE-Aging Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 4:05:57 PM | | CANC |
|
|
|
ELE16-02172
| Final | 7/21/2016 | 7/22/2016 | 7/22/2016 4:05:38 PM | P | PASS |
|
|
Bill Peace is contact on this job at ###-####. Phone #: ###-#### Inspection requested via web by Debby Pierce Final ok
|
ELE16-00303
| Electrical Rough-In | 7/22/2016 | 7/22/2016 | 7/22/2016 3:29:23 PM | P | PART |
|
|
Grid ceiling cover inspection floors 2 and 3.Not all rooms are ready, but would like to get as many as we can inspected.Contact is Eric Gibson ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves Grid 2nd floor 245 thru 251, 254 thru 258. Boarder as noted on contractor print only. Grid 3rd floor open offices 325, 326, rms 340, 350, 354, 355, 356, 358, 360, 366, 367. Boarders as noted on contractor print rms 351, 352, 363, 368. Areas noted rough in ok cover
|
ELE15-00495
| Electrical Rough-In | 7/22/2016 | 7/22/2016 | 7/22/2016 3:22:58 PM | P | PASS |
|
|
Ceiling inspection for cover. First floor lobby. 9th floor lobby. Contact is Eric Gibson ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves 1st floor lobby hardlit and bath foyer ceiling rough in ok cover
|
ELE16-01799
| Electrical Rough-In | 7/22/2016 | 7/22/2016 | 7/22/2016 2:09:02 PM | P | PASS |
|
|
Ceiling Phone #: ###-#### Inspection requested via web by kendall bender 2 small areas grid waiting on recessed glass will call in. rest of grid rough in ok cover
|
MIS16-00227
| ELE-Conference | 7/22/2016 | 7/22/2016 | 7/22/2016 1:18:14 PM | P | DONE |
|
|
Spoke with owner of rental house at 2706 N. 26th st. about complaint and correction notice left 7-21-16. Owner stated back building in question will be demolished soon when new house is built on back portion of lot. Building permit has been applied for for new house. Electrical in question will be disconnected ASAP and removed when construction begins on new house.
|
ELE05-03644
| Final | 7/21/2016 | 7/22/2016 | 7/22/2016 12:40:52 PM | A | PASS |
|
|
would like call ahead; Bob Phone #: ###-#### Final ok
|
ELE16-01477
| Electrical Rough-In | 7/21/2016 | 7/22/2016 | 7/22/2016 11:58:28 AM | A | PASS |
|
|
IN wall rough in inspection in pharmacy in the AM if possible call cody for questions ###-#### thanks Phone #: ###-#### Inspection requested via web by Shane Lott Wall rough in ok cover
|
ELE16-02350
| Final | 7/21/2016 | 7/22/2016 | 7/22/2016 11:32:42 AM | A | NH |
|
|
Phone #: ###-#### Inspection requested via web by Stacie Tasker No at location contractor will recall
|
ELE15-01617
| Electrical Rough-In | 7/21/2016 | 7/22/2016 | 7/22/2016 11:14:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 1st floor soffits and bath foyer lids rough in ok cover
|
ELE16-00758
| Final | 7/21/2016 | 7/22/2016 | 7/22/2016 10:55:12 AM | A | PASS |
|
|
Corrections have been completed Phone #: ###-#### Inspection requested via web by Shaun Kirkman Final ok
|
ELE15-02641
| Electrical Rough-In | 7/21/2016 | 7/22/2016 | 7/22/2016 10:41:43 AM | A | PASS |
|
|
RM 604 ; 605 Phone #: ###-#### Inspection requested via web by Kerri Hamilton 604, 605 drop lids rough in ok cover
|
ELE16-01838
| Electrical Rough-In | 7/22/2016 | 7/22/2016 | 7/22/2016 10:18:44 AM | A | CANC |
|
|
EQDBB DIST and its 277/480v BC Panels, 120/208 v BC Panels LSDBB DIST and its 277/480v BC Panels, 120/208v BC Panels MDBB Dist and its associated 480 v Controllers Phone #: ###-#### Inspection requested via web by Tom Betty Request on wrong permit.
|
ELE15-01348
| Electrical Rough-In | 7/22/2016 | 7/22/2016 | 7/22/2016 10:16:10 AM | P | PASS |
|
|
EQDBB DIST and its 277/480v BC Panels, 120/208 v BC Panels LSDBB DIST and its 277/480v BC Panels, 120/208v BC Panels MDBB Dist and its associated 480 v Controllers Phone #: ###-#### Inspection requested via web by Tom Betty Still working on panic hardware for electrical rms on lower level. Walked equipment rm in lower level and up thru 4 electrical rms.
|