Inspections for the day of: Friday, July 22, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Little
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM16-02384 Plumbing Rough-in7/21/20167/22/20167/22/2016 4:41:42 PMPPASS
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
PLM16-02546 Plumbing Rough-in7/22/20167/22/20167/22/2016 4:23:40 PMPPASS
PLM16-00468 Final7/20/20167/22/20167/22/2016 2:32:28 PMPPASS
Please call Kyle with any questions ###-#### Phone #: ###-#### Inspection requested via web by Kelly King
PLM16-02557 Plumbing Rough-in7/22/20167/22/20167/22/2016 1:51:07 PMPPASS
PLEASE COME LATER IN AFTERNOON. Phone #: ###-#### Inspection requested via web by Chris Field
PLM16-00761 Final7/21/20167/22/20167/22/2016 11:47:33 AMAPASS
Jim, toilet, utility sink, floor drain in the aux. bldg functional ; ready for final inspection.
I decided not to connect the sink in the half-bath. Request your final inspection . Thank you. Jacqueline Manderscheid Phone #: ###-#### Inspection requested via web by Jacqueline Manderscheid
>only wc and utility sink set at time of final, homeowner says she is not doing the lav or floor drain.
PLM16-02573 Plumbing Rough-in7/22/20167/22/20167/22/2016 11:26:30 AMPFAIL
Kevin Phone #: ###-####
>fix 3 leaks on dwv
PLM05-03090 Final7/21/20167/22/20167/22/2016 10:34:29 AMAPASS
would like call ahead; Bob Phone #: ###-####
PLM16-02263 Water and/or Sewer7/21/20167/22/20167/22/2016 10:18:00 AMACANC
Scott Orr is Tech on site. Please contact him directly @ ###-#### Phone #: ###-#### Inspection requested via web by Maira Guzman
PLM16-02263 DOC - Permit Finaled7/22/20167/22/20167/22/2016 10:17:46 AMPPASS
PLM16-02263 Roof Drains7/22/20167/22/20167/22/2016 10:17:37 AMAPASS
Scott Orr is Tech on site. Please contact him directly @ ###-#### Phone #: ###-#### Inspection requested via web by Maira Guzman
>same roof loading just added an additional sump and scupper in area's and re sloped crickets. new rd's ok
PLM16-02557 Plumbing Rough-in7/21/20167/22/20167/22/2016 9:20:32 AMAFAIL
JOB SUPER: PAUL Phone #: ###-#### Inspection requested via web by Chris Field
>dwv test fail
PLM16-02280 Final7/21/20167/22/20167/22/2016 9:03:16 AMAPASS
BRAD IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
>super said he will caulk mop sink once epoxy paint is done, final ok.
PLM16-02546 Plumbing Rough-in7/21/20167/22/20167/22/2016 8:47:52 AMANR
Please call Skyler with any questions ###-#### Phone #: ###-#### Inspection requested via web by Ben Davis
PLM16-00447 PLM-Aging Inspection7/22/20167/22/20167/22/2016 8:26:24 AM PASS
wip
PLM16-02557 Water and/or Sewer7/21/20167/22/20167/21/2016 1:52:25 PMACANC
SITE SUPER:PAUL, ###-#### ROUGH IN REINSPECT Phone #: ###-#### >> Inspection requested via web by Chris Field Inspection cancelled from web by: Chris Field