BLD15-01519
| BLD-Ceiling Grid Inspection | 7/22/2016 | 7/22/2016 | 7/27/2016 7:55:47 AM | P | PART |
|
|
floors 6and 7
|
BLD14-03207
| BLD-Conference | 7/22/2016 | 7/22/2016 | 7/27/2016 7:40:01 AM | P | PEND |
|
|
Adam Phone #: ###-####
|
BLD16-01581
| BLD-Ceiling Grid Inspection | 7/22/2016 | 7/22/2016 | 7/22/2016 2:49:26 PM | P | PASS |
|
|
Mike Phone #: ###-####
|
BLD16-00244
| BLD-Framing/Rough-in | 7/21/2016 | 7/22/2016 | 7/22/2016 2:20:20 PM | A | PART |
|
|
Bob Phone #: ###-#### first floor ok to insulate
|
GCB15-00128
| GCB-Footing | 7/22/2016 | 7/22/2016 | 7/22/2016 2:19:26 PM | P | PASS |
|
|
Jay ###-####
|
BLD16-00560
| BLD-Final | 7/22/2016 | 7/22/2016 | 7/22/2016 2:04:40 PM | P | PASS |
|
|
Chad Phone #: ###-####
|
BLD14-02889
| BLD-Ceiling Grid Inspection | 7/21/2016 | 7/22/2016 | 7/22/2016 1:50:49 PM | A | PASS |
|
|
Re- inspection drop ceiling 604 and inspection drop ceiling 605 Phone #: ###-#### Inspection requested via web by Michael Zaccheo
|
BLD16-00169
| BLD-Conference | 7/22/2016 | 7/22/2016 | 7/22/2016 1:50:14 PM | P | DONE |
|
|
Jeff Phone #: ###-####
|
GCB15-00035
| GCB-Final | 7/21/2016 | 7/22/2016 | 7/22/2016 10:40:36 AM | A | NR |
|
|
Scott ###-#### - code: 2746
|
GCB15-00090
| GCB-Energy | 7/21/2016 | 7/22/2016 | 7/22/2016 10:02:13 AM | A | PART |
|
|
Chris ###-#### - exterior insulation and vapor barrier - requested call ahead slab edge ok north half
|
BLD16-02044
| BLD-Footing | 7/21/2016 | 7/22/2016 | 7/22/2016 10:01:15 AM | A | PASS |
|
|
Bill// prefers late am Phone #: ###-####
|