Inspections for the day of: Friday, July 22, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-04346 FIRE-Final Inspection7/21/20167/22/20167/22/2016 3:44:55 PMAPART
A temporary occupancy is approved for 30 days with Scott's permission. For a final I need the project related fire alarm permit finaled which includes re-submittals and a map, and I need the building plan modifications for the revised fire pump room to be approved and any corrections implemented.
FIR16-00122 INSP-Final Inspection7/22/20167/22/20167/22/2016 3:44:08 PMAPART
A temporary occupancy is approved for 30 days with Scott's permission. For a final I need the fire alarm resubmittals approved a map and NFPA 72's.
FIR16-00052 INSP-Sprinkler Rough-in/Hydro7/21/20167/22/20167/22/2016 2:37:36 PMPPART
For a cover inspection to be approved I need all of the draft stops installed per plan (one is missing entirely). Insulation in several locations is hanging down and blocking upright sprinkler head coverage. As per a previous request I need approved plans showing the extended coverage sidewalls in the northwest rooms. The overhead hydro test passed but the underground hydro test failed.
FIR16-00052 INSP-Supply line flush7/21/20167/22/20167/22/2016 2:18:19 PMPFAIL
The underground hydro test failed so no flush was performed.
BLD15-03897 FIRE-Final Inspection7/22/20167/22/20167/22/2016 1:46:20 PMPPASS
Life safety passed. Per Boise Fire Dept. a man gate will not be required at the new hanger building allowing access to the flight line due to additional fire hydrants near the flight line and vehicle access from a neigboring street and gate.
BLD16-01915 FIRE-Final Inspection7/22/20167/22/20167/22/2016 1:36:56 PMPPASS
life safety passed
FIR16-00359 INSP-Final Inspection7/20/20167/22/20167/22/2016 1:16:49 PMAPASS
permit finaled
BLD16-02454 FIRE-Final Inspection7/21/20167/22/20167/22/2016 10:24:02 AMAPASS
Life safety passed
BLD16-01280 FIRE-Final Inspection7/22/20167/22/20167/22/2016 8:26:20 AMPPASS
life safety passed
FIR16-00451 INSP-Final Inspection7/21/20167/22/20167/22/2016 8:25:22 AMAPASS
Permit finaled
BLD16-01915 FIRE-Final Inspection7/21/20167/22/20167/22/2016 8:23:45 AMACANC
Not ready for final life safety due to missing ceiling tile. I did test the emergency lights and exit signs which tested ok.
FIR16-00467 INSP-Final Inspection7/21/20167/22/20167/22/2016 8:19:17 AMAPASS
permit finaled
FIR16-00427 INSP-Sprinkler Rough-in/Hydro7/21/20167/22/20167/22/2016 8:16:45 AMAPASS
Rough-in and tenting passed. Leroy was going to modify tenting at the west end of the house. Piping can be covered. Underground is still not deep enough and the supply piping under the house still needs verified.
FIR16-00359 INSP-Sprinkler Rough-in7/20/20167/22/20167/22/2016 8:14:51 AMAPASS
Rough-in passed. Piping can be covered.