Inspections for the day of: Friday, July 22, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00928 General Inspection7/20/20167/22/20167/22/2016 4:03:00 PMAPASS
follow up BMP violation for sweeping/housekeeping

DI bag was changed out as requested. Sweep up in progress. Will check conditions early next week. Initial request has been addressed by RP. Approved.
ESC15-01612 Aging Inspection7/22/20167/22/20167/22/2016 3:21:08 PM CANC
rescheduled for site final next week. Landscaping and final clean up is in progress.
ESC16-00603 Site Preparation7/22/20167/22/20167/22/2016 3:18:11 PMPPASS
Central Paving on site setting up staging area. Silt fence along bottom of site and rock construction entrance. Plan is to leave a channel through site to convey any flash flooding that could potentially occur. Currently the creek is dry. SWPPP box and ESC permit on site. Approved. eNOI is active, tracking # IDR12AM85
ESC15-01564 Aging Inspection7/22/20167/22/20167/22/2016 2:44:20 PM PASS
Final landscaping and site clean up in progress. Once complete, will have Brighton Homes pull all temporary sediment filter bags from Mill District Square storm drains.
ESC16-00659 General Inspection7/22/20167/22/20167/22/2016 2:31:59 PMPPASS
WIP on framing. No sediment or other materials leaving site. Trash and materials contained. Clean site. Permit sign posted.
ESC15-01389 General Inspection7/21/20167/22/20167/22/2016 2:25:34 PMPPASS
Home now complete and occupied. Adjacent lot was cleaned up as requested. Yard landscaped and stabilzed. ESC conditions satisfied.
ESC15-01389 DOC - Permit Finaled7/22/20167/22/20167/22/2016 2:24:08 PMPPASS
ESC16-00868 Site Preparation7/22/20167/22/20167/22/2016 10:23:08 AMAPASS
BMPs installed. Permit sign posted. Approved for excavation. 6 total cottages at Bryn Mawr Cove
ESC16-00888 Site Preparation7/21/20167/22/20167/22/2016 10:03:38 AMAPASS
Bill Phone #: ###-####

Bill Phone #: ###-####

Site is prepared for excavation. Access drive and permeable pavers for parking were installed previously. MS4 inlet on Targee has sediment bag installed. Perimeter silt fence and clearing limit is established. Permit signs posted. Reminder to have trash containment and concrete washout during foundation work.
ESC16-00886 Site Preparation7/21/20167/22/20167/22/2016 10:03:25 AMAPASS
Bill Phone #: ###-####

Bill Phone #: ###-####

Site is prepared for excavation. Access drive and permeable pavers for parking were installed previously. MS4 inlet on Targee has sediment bag installed. Perimeter silt fence and clearing limit is established. Permit signs posted. Reminder to have trash containment and concrete washout during foundation work.
ESC16-00885 Site Preparation7/21/20167/22/20167/22/2016 10:03:14 AMAPASS
Bill Phone #: ###-####

Bill Phone #: ###-####

Site is prepared for excavation. Access drive and permeable pavers for parking were installed previously. MS4 inlet on Targee has sediment bag installed. Perimeter silt fence and clearing limit is established. Permit signs posted. Reminder to have trash containment and concrete washout during foundation work.
ESC16-00884 Site Preparation7/21/20167/22/20167/22/2016 10:02:55 AMAPASS
Bill Phone #: ###-####

Bill Phone #: ###-####

Site is prepared for excavation. Access drive and permeable pavers for parking were installed previously. MS4 inlet on Targee has sediment bag installed. Perimeter silt fence and clearing limit is established. Permit signs posted. Reminder to have trash containment and concrete washout during foundation work.
ESC16-00883 Site Preparation7/21/20167/22/20167/22/2016 10:02:40 AMAPASS
Bill Phone #: ###-####

Site is prepared for excavation. Access drive and permeable pavers for parking were installed previously. MS4 inlet on Targee has sediment bag installed. Perimeter silt fence and clearing limit is established. Permit signs posted. Reminder to have trash containment and concrete washout during foundation work.
ESC15-00667 General Inspection7/22/20167/22/20167/22/2016 9:00:28 AM PEND
Silt fence installed along drainage ditches need to be removed in order to final permit. No other issues, road shoulders and disturbed areas have been stabilzed.