BLD19-01777
| BLD-Footing | 7/22/2019 | 7/22/2019 | 7/22/2019 4:26:42 PM | P | PART |
|
|
pouring at 8am tomorrow morning // Dusty Phone #: ###-####//hillside ok per Melissa//rebar ok//side and back setbacks of main house ok//will need to chech setbacks at wall inspection and garage section//
|
BLD19-01177
| BLD-Final | 7/22/2019 | 7/22/2019 | 7/22/2019 4:25:27 PM | P | CANC |
|
|
Vinnie Phone #: ###-####
|
BLD19-01308
| BLD-Conference | 7/19/2019 | 7/22/2019 | 7/22/2019 4:02:08 PM | P | PASS |
|
|
Looking for a quick inspection on the framing of my second small roof before I cover and shingle. I am having minor finger surgery at 1:00 so I am hoping the inspection could be after 3:00 but I could be home earlier. Inspection requested via web by Ron MacCulloch//framing ok//will add truss brace//sheat walls//
|
BLD19-00236
| BLD-Framing/Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 3:08:58 PM | P | PART |
|
|
Call ahead // Scott Phone #: ###-####//framing changes on plans made for interior//trades passed//will need inspections for deck structural//
|
BLD19-02646
| BLD-Conference | 7/22/2019 | 7/22/2019 | 7/22/2019 1:29:13 PM | P | DONE |
|
|
Donald Phone #: ###-####
|
BLD18-04488
| BLD-Blower Door Test Results | 7/22/2019 | 7/22/2019 | 7/22/2019 12:33:53 PM | P | DONE |
|
|
5.0ACH50
1005 cfm @ 50 pa
|
BLD18-04488
| BLD-Final | 7/22/2019 | 7/22/2019 | 7/22/2019 12:32:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson
|
BLD18-04488
| DOC - Permit Finaled | 7/22/2019 | 7/22/2019 | 7/22/2019 12:31:50 PM | P | PASS |
|
|
|
BLD18-03811
| BLD-Framing/Rough-in | 7/22/2019 | 7/22/2019 | 7/22/2019 12:03:37 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Andy Thompson//ok to finish//architect approved changes to framing corrections for decorative simpson hardware//
|
BLD19-02101
| BLD-Framing/Rough-in | 7/19/2019 | 7/22/2019 | 7/22/2019 11:24:28 AM | A | DONE |
|
|
Taylor Barton is contact Phone #: ###-#### Inspection requested via web by BRS Permitting//no structural changes required on permit//
|
BLD19-00634
| BLD-Final | 7/18/2019 | 7/22/2019 | 7/22/2019 10:49:48 AM | A | CANC |
|
|
Brittany Phone #: ###-####
|
BLD18-03121
| BLD-Energy code compliance | 7/19/2019 | 7/22/2019 | 7/22/2019 9:56:40 AM | A | PASS |
|
|
Matt Phone #: ###-####//corrections made//103,104, 203, 204, 303, 304// ok to cover//
|
BLD19-00886
| BLD-Final | 7/19/2019 | 7/22/2019 | 7/22/2019 9:35:27 AM | A | PASS |
|
|
Call ahead // Kirk Phone #: ###-####//final complete per scope of work and engineering//interior is unfinished//
|
BLD19-00886
| DOC - Permit Finaled | 7/22/2019 | 7/22/2019 | 7/22/2019 9:34:47 AM | P | PASS |
|
|
|
BLD19-00290
| BLD-Ceiling Grid Inspection | 7/21/2019 | 7/22/2019 | 7/22/2019 8:47:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Brian Wilson//trades passed//ok to cover grid//
|
BLD19-00754
| BLD-Framing/Rough-in | 7/12/2019 | 7/22/2019 | 7/22/2019 12:00:00 AM | A | CANC |
|
|
THIS WAS CANCEL THE MORNING OF Jim Phone #: ###-####
|
BLD19-02433
| BLD-Footing | 7/19/2019 | 7/22/2019 | 7/19/2019 3:07:18 PM | A | CANC |
|
|
Inspection requested 7/22, 10:30-11:30AM if at all possible please. Phone #: ###-#### >> Inspection requested via web by David Dexter Inspection cancelled from web by: David Dexter
|
BLD19-01308
| BLD-Conference | 7/19/2019 | 7/22/2019 | 7/19/2019 2:37:33 PM | P | CANC |
|
|
Looking for inspection and approval of the framing of my second small roof before I cover and shingle. Phone #: ###-#### >> Inspection requested via web by Ron MacCulloch Inspection cancelled from web by: Ron MacCulloch Inspection cancelled from web by: Ron MacCulloch
|