Inspections for the day of: Wednesday, July 22, 2020.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-02176 Permanent Service7/22/20207/22/20207/22/2020 2:42:59 PMPFAIL
We need a permanent service inspection for the Verizon disconnect at the SW corner of 6th ; State. Please call Joe with any issues or questions. ###-#### Phone #: ###-#### Inspection requested via web by Joe McLean 250.24- Electrical service Shall have a grounding electrode conductor installed and connected to the grounded conductor. 250.50- If a grounding electrode is not present one shall be installed as described in 250.52 1 thru 7.
ELE20-00596 Permanent Service7/21/20207/22/20207/22/2020 2:42:33 PMAFAIL
Phone #: ###-#### Inspection requested via web by james mair 110.24- Availalbe fault current shall be posted prior to permanent service inspection. 250.24- Grounding electrode conductor shall be connected to the grounded conductor at any accessible location on load side of service point. Contactor decided to bond the grounded conductor in CT can and use grounded conductor to bond non-current carrying metal parts of maiin service disconnecting means and panel board as permitted by 250.142(A)(1). Will recall when ready.
ELE20-02521 Final7/21/20207/22/20207/22/2020 1:51:27 PMPNR
Late PM if possible, please. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Met on site and discussed grounding electrode conductors termination points. Point of service has moved to transfer switch 2500 amp main breaker creating all existing gear to be sub fed from ATS. Normal power to bond grounded conductor at ATS main disconnecting means and emergency power to bond grounded conductor at generator due to grounded conductor being switched at ATS as per 250.30. Performance testing to be done and permanent service to be requested when complete.
ELE20-00371 Final7/21/20207/22/20207/22/2020 12:26:36 PMAFAIL
Garage code 4908
Phone #: ###-#### Inspection requested via web by Ryan Wake 110.3- Equipment shall work as per instructions. Island counter top receptacles and down bed GFCI behind dor not working. 210.52(C)- Pantry counter top spaces shall have receptacle outlets installed so that not point on counter top is more than 24" from a receptacle outlet. 314.23- Island pop-up receptacle assemblies shall be secured in place.
* unable to verify a disconnecting means for air curtain.
ELE20-02500 Rough-In Permanent Service7/21/20207/22/20207/22/2020 11:02:00 AMAPASS
Phone #: ###-#### Inspection requested via web by Troy Ballard Rough in ok cover p/s u/g n ok
ELE20-02431 Electrical Rough-In7/21/20207/22/20207/22/2020 10:26:40 AMAPASS
ufer and conduit stubs for pad 2. Please show up after 9 if possible. Phone #: ###-#### Inspection requested via web by Tom Jenkins Building 2 is the eastern most building. 2 conduit stubs and concrete encased electrode for this building rough in ok cover
ELE19-04508 Electrical Rough-In7/21/20207/22/20207/22/2020 9:37:39 AMAPASS
Rough In inspection for the 4th Floor PT Deck.
Contact electrician John (Homey) McElroy with any questions.
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 4 pour 2 rough in ok cover
ELE19-03829 Electrical Rough-In7/21/20207/22/20207/22/2020 9:14:21 AMAPASS
Rough in Inspection for the 8th Floor Walls.
Contact electrician Shawn Evins with any questions.
Thank you, Phone #: ###-#### Inspection requested via web by Cathy Duchek Level 8 core walls and stair 2 from level 5 down wall rough in ok cover