BLD19-03475
| BLD-Aging Inspection | 7/22/2020 | 7/22/2020 | 7/28/2020 7:21:40 AM | | PEND |
|
|
see enty from 7/27/2020, needs permit for addition and exterior deck//
|
BLD20-01294
| BLD-Ceiling Grid Inspection | 7/21/2020 | 7/22/2020 | 7/23/2020 10:03:53 AM | A | PASS |
|
|
Bridger ###-####//grid ok per the plans//
|
BLD20-01853
| BLD-Footing | 7/22/2020 | 7/22/2020 | 7/22/2020 3:54:18 PM | P | NR |
|
|
Cameron *screened* Phone #: ###-####//need to provide alternate footing design from engineer for monopour//let contractor and homeowner know//
|
BLD20-01191
| BLD-Framing/Rough-in | 7/21/2020 | 7/22/2020 | 7/22/2020 3:53:33 PM | P | NR |
|
|
Chris - */non occupied residence SCREENED*/ Phone #: ###-####//new engineering provided for part of the corrections--still need engineering for underfloor//patio is still under review//some areas of concern are existing wall heights and same use//Chris will provide clarification from engineer on part of the new engineering//
|
BLD20-01286
| BLD-Other | 7/21/2020 | 7/22/2020 | 7/22/2020 3:39:48 PM | P | PASS |
|
|
Drywall soffits Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-01287
| BLD-Other | 7/21/2020 | 7/22/2020 | 7/22/2020 2:55:58 PM | P | PASS |
|
|
Drywall soffits Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-01290
| BLD-Other | 7/21/2020 | 7/22/2020 | 7/22/2020 2:51:04 PM | P | PASS |
|
|
Drywall soffits Phone #: ###-#### Inspection requested via web by Joel Hirtle
|
BLD20-01289
| BLD-Other | 7/21/2020 | 7/22/2020 | 7/22/2020 1:55:23 PM | P | FAIL |
|
|
Drywall soffits Phone #: ###-#### Inspection requested via web by Joel Hirtle//eaves on high side need rated back to wall line//
|
BLD20-01292
| BLD-Other | 7/21/2020 | 7/22/2020 | 7/22/2020 1:54:51 PM | P | FAIL |
|
|
Drywall soffits Phone #: ###-#### Inspection requested via web by Joel Hirtle//all areas within 3 feet of PL need to be 1 hour rated//
|
BLD20-00774
| BLD-Framing/Rough-in | 7/22/2020 | 7/22/2020 | 7/22/2020 1:14:32 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//CN posted for framing corrections//2nd floor shear appears to be ok, nailing is covered//ok to insulate only--framing corrections will need to be completed//
|
MIS20-00231
| Set Bond Amount | 7/21/2020 | 7/22/2020 | 7/22/2020 12:05:34 PM | A | DONE |
|
|
Dale Phone #: ###-####//$800 bond required for 400 sq ft outbuildinng located on back of lot//
|
BLD20-01397
| BLD-Framing/Rough-in | 7/21/2020 | 7/22/2020 | 7/22/2020 11:36:34 AM | A | PART |
|
|
call 15 minutes before.. SCREENED // dave Phone #: ###-####//most corrections made//still need engineers approval on trusses that the top chord was cut and replaced//see correction notice onsite//
|
BLD20-01384
| BLD-Ceiling Grid Inspection | 7/21/2020 | 7/22/2020 | 7/22/2020 10:27:07 AM | A | PASS |
|
|
Please cal me 30 mins ahead of time so I can meet you there. Phone #: ###-#### Inspection requested via web by Gerome Fries//trades ok//grid installed//
|
BLD20-01877
| BLD-Framing/Rough-in | 7/21/2020 | 7/22/2020 | 7/22/2020 10:27:06 AM | A | DEFR |
|
|
Jay Walters is the onsite contact - ###-#### Phone #: ###-#### Inspection requested via web by BRS Permitting//no framing changes needed per the structural engineers letter//
|
BLD20-01418
| BLD-Wall Bracing | 7/21/2020 | 7/22/2020 | 7/22/2020 10:27:06 AM | A | FAIL |
|
|
screened // Clarence Phone #: ###-####//see CN onsite//
|
BLD20-02123
| BLD-Footing | 7/21/2020 | 7/22/2020 | 7/22/2020 8:53:55 AM | A | PART |
|
|
first thing//corrections have been made for rebar//ok per the approved plans//WIP//
|