Inspections for the day of: Tuesday, July 23, 1996.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE96-02125 INSP - Ele Rough-In/Perm Svc7/22/19967/23/19967/24/1996 12:00:00 AMAPASS
07/24/96 315 - 09&53 ok jf was done on 7/24/96
ELE96-02355 INSP - Ele Rough-In/Perm Svc7/23/19967/23/19967/24/1996 12:00:00 AMPCANC
07/24/96 315 - 15 ROOMS done by JRay jf
ELE96-01457 INSP - Final7/23/19967/23/19967/24/1996 12:00:00 AMPPASS
07/24/96 315 - 14 ok jf sur. posted NEC,250-114 (a)
ELE96-01536 INSP - Final7/23/19967/23/19967/24/1996 12:00:00 AMPPASS
07/24/96 315 - 14 ok jf sur. posted 250-114(a)
ELE96-02002 INSP - Final7/23/19967/23/19967/24/1996 12:00:00 AMPPASS
07/24/96 315 - 14 ok jf
ELE96-02125 INSP - Ele Rough-In/Perm Svc7/23/19967/23/19967/23/1996 12:00:00 AM PASS
/ / 315 - 09&53 ok jf 10rms 1a/c 200a u/g new
ELE96-01830 INSP - Final7/22/19967/23/19967/23/1996 12:00:00 AMANH
07/23/96 315 - NALC jf
ELE96-01859 INSP - Final7/22/19967/23/19967/23/1996 12:00:00 AMAPASS
07/23/96 315 - 14 ok jf sur. posted BCC install all light bulbs, and nee dinning,and 1 upstairs bed rm
ELE96-01860 INSP - Final7/22/19967/23/19967/23/1996 12:00:00 AMANR
07/23/96 315 - 14 NR notice posted DW,RH,and outside light not installed
ELE96-01904 INSP - Final7/22/19967/23/19967/23/1996 12:00:00 AMAPASS
07/23/96 315 - 14 ok jf
ELE96-02346 INSP - Ele Rough-In/Perm Svc7/22/19967/23/19967/23/1996 12:00:00 AMAPASS
07/23/96 315 - 09&53 ok jf 14rms 1a/c 200a u/g new
ELE96-02220 INSP - Electrical Rough-In7/22/19967/23/19967/23/1996 12:00:00 AMPCANC
07/23/96 315 - 1PM PLEASE PER LEE RILEY. will do on (PM) inspection mo
ELE96-01682 INSP - Final7/23/19967/23/19967/23/1996 12:00:00 AMPPASS
07/23/96 315 - 14 ok jf