Inspections for the day of: Wednesday, July 23, 1997.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD97-00848 INSP - Final7/23/19977/23/19977/23/1997 12:00:00 AM FAIL
/ / 407 -
BLD97-00515 INSP - Letter of compliance7/23/19977/23/19977/23/1997 12:00:00 AM PASS
/ / 407 - lc #12758
BLD97-00515 INSP - Letter of compliance7/23/19977/23/19977/23/1997 12:00:00 AM PASS
/ / 407 - lc #12758
BLD97-02106 INSP - Letter of compliance7/23/19977/23/19977/23/1997 12:00:00 AM PASS
/ / 407 - lc #12756 re-roof home
BLD97-02106 INSP - Letter of compliance7/23/19977/23/19977/23/1997 12:00:00 AM PASS
/ / 407 - lc #12756 re-roof home
BLD97-02121 INSP - Footings7/22/19977/23/19977/23/1997 12:00:00 AMAPASS
07/23/97 407 -
BLD97-00669 INSP - Final7/22/19977/23/19977/23/1997 12:00:00 AMANR
07/23/97 407 - not ready
MEC97-01928 INSP - Rough-in & Gas Pressure7/22/19977/23/19977/23/1997 12:00:00 AMAFAIL
07/23/97 407 -
BLD97-00515 INSP - Final7/22/19977/23/19977/23/1997 12:00:00 AMAPASS
07/23/97 407 - key on light at front door
MEC97-01394 INSP - Final7/23/19977/23/19977/23/1997 12:00:00 AMPFAIL
07/23/97 407 - PLUS FIREPLACE
MEC97-01394 INSP - Final7/23/19977/23/19977/23/1997 12:00:00 AMPFAIL
07/23/97 407 - PLUS FIREPLACE
BLD97-00927 INSP - Framing/Rough-in7/23/19977/23/19977/23/1997 12:00:00 AMPPART
07/23/97 407 - RE-INSPECTION ok to sheetrock all except for the garage front still need to have corre resolved about engineering talk with the contractor about this 7/23/97. all other corrections ok.
BLD97-00927 INSP - Energy code compliance7/23/19977/23/19977/23/1997 12:00:00 AMPPASS
07/23/97 407 -
BLD97-00932 INSP - Energy code compliance7/23/19977/23/19977/23/1997 12:00:00 AMPPASS
07/23/97 407 -
BLD97-00932 INSP - Framing/Rough-in7/23/19977/23/19977/23/1997 12:00:00 AMPPART
07/23/97 407 - RE-INSPECTION ok to sheetrock all except for the garage fronts still need prior correc engineering at front talked with contractor 7/23/97 about this.
BLD97-01821 INSP - Framing/Rough-in7/22/19977/23/19977/23/1997 12:00:00 AMPPASS
07/23/97 407 -
BLD97-01923 INSP - Foundation7/22/19977/23/19977/23/1997 12:00:00 AMPPASS
07/23/97 407 - EARLY PM PLEASE left portion of basement only still need to call for rest of basement be pour told this to contractor.