PLM01-02446
| Water and/or Sewer | 7/23/2001 | 7/23/2001 | 7/23/2001 12:00:00 AM | P | PASS |
|
|
w/s final ###-####
|
PLM01-02447
| Water and/or Sewer | 7/23/2001 | 7/23/2001 | 7/23/2001 12:00:00 AM | P | PASS |
|
|
w/s final ###-####
|
PLM01-01588
| Final | 7/23/2001 | 7/23/2001 | 7/23/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 10:59:25. Contact: ###-####. access 7550 enter
|
PLM01-02425
| Sprinkler (Final) | 7/23/2001 | 7/23/2001 | 7/23/2001 12:00:00 AM | P | CANC |
|
|
###-####
|
PLM01-01698
| Final | 7/23/2001 | 7/23/2001 | 7/23/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 309 On 7/23/2001 2:12:36 PM
|
PLM01-01430
| Plumbing Rough-in | 7/23/2001 | 7/23/2001 | 7/23/2001 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 309 On 7/23/2001 3:32:57 PM Jim needs to reset mens toilet and install a st-12 thermal exspanion tank. 7/23/2001 5:22:50 PM this was actually a final inspect, I sighned the temp occ for now, look for other equip on final final but appeared all was there. 7/23/2001 5:24:14 PM
|