Inspections for the day of: Monday, July 23, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Tawney
TitleFIRE INSPECTOR
Phone #340-1295
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR01-00321 INSP-Alarm Testing7/20/20017/23/20017/23/2001 12:00:00 AMAFAIL
###-#### Final Fail C/N issued 7/23/2001 12:30:34 PM
FIR01-00340 INSP-Supply line flush7/20/20017/23/20017/23/2001 12:00:00 AMAPASS
OK on supply line hydro test 7/23/2001 5:30:07 PM
BLD01-00880 FIRE-Final Inspection7/20/20017/23/20017/23/2001 12:00:00 AMAFAIL
###-#### Final Fail C/N issued 7/23/2001 8:55:40 AM
FIR01-00321 INSP-Final Inspection7/20/20017/23/20017/23/2001 12:00:00 AMACANC
after 1 ###-####
BLD00-03498 FIRE-Conference7/20/20017/23/20017/23/2001 12:00:00 AMPPASS
###-#### Conf with contr regarding dust equip interlock and spray booth 7/23/2001 5:21:25 PM
BLD01-00710 FIRE-Final Inspection7/23/20017/23/20017/23/2001 12:00:00 AMPFAIL
###-#### Final Fail C/N issued 7/23/2001 6:23:53 PM
BLD01-00366 FIRE-Final Inspection7/23/20017/23/20017/23/2001 12:00:00 AMPPASS
Final OK for certificate of completion 7/24/2001 2:29:25 PM
BLD01-00951 BLD-Conference7/23/20017/23/20017/23/2001 12:00:00 AMPPASS
Added by Inspector: 406 On 7/23/2001 4:31:54 PM Conf with John Kennedy about instalation of "Prep room" I have questions about permit.
FIR01-00387 INSP-Sprinkler Rough-in/Hydro7/20/20017/23/20017/23/2001 12:00:00 AMPPART
OK above ground hydro test for West half of sanctuary 7/23/2001 5:23:32 PM
BLD00-02809 FIRE-Final Inspection7/20/20017/23/20017/23/2001 12:00:00 AMPFAIL
###-#### Final Fail C/N issued 7/23/2001 3:46:16 PM