PLM02-00906
| Groundwork | 7/22/2002 | 7/23/2002 | 7/23/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/22/2002 at 14:31:40. Contact: ###-####. cooling tower ; floor sinks gw at cooling tower test ok , water to vault installed without a permit or inspection left correction notice 7/23/2002 9:53:28 AM
|
PLM02-00605
| Final | 7/22/2002 | 7/23/2002 | 7/23/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/22/2002 at 14:43:52. Contact: .
|
PLM02-02228
| Water and/or Sewer | 7/23/2002 | 7/23/2002 | 7/23/2002 12:00:00 AM | P | NR |
|
|
water line- charles-- ###-####
|
PLM02-02229
| Plumbing Rough-in | 7/23/2002 | 7/23/2002 | 7/23/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-01196
| Final | 7/23/2002 | 7/23/2002 | 7/23/2002 12:00:00 AM | P | PASS |
|
|
door code 0000; Phone #: ###-####
|