Inspections for the day of: Tuesday, July 23, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01778 BLD-Framing/Rough-in7/22/20027/23/20027/23/2002 12:00:00 AMAFAIL
steve ; Phone #: ###-#### 2 bld'sneed truss det , a bolts. 7/23/2002 12:15:35 PM
BLD02-01133 BLD-Framing/Rough-in7/22/20027/23/20027/23/2002 12:00:00 AMAFAIL
; Phone #: ###-####Hold down at front door needs completion, staple at mud seal most all areas and above some hd's contraqctors on site request re-insp for pm. 7/23/2002 10:47:05 AM
BLD01-02082 BLD-Final7/22/20027/23/20027/23/2002 12:00:00 AMAPASS
chris ###-####
BLD01-02534 BLD-Final7/22/20027/23/20027/23/2002 12:00:00 AMAPASS
chris ###-####
BLD02-01578 BLD-Footing7/22/20027/23/20027/23/2002 12:00:00 AMAPASS
JIM; Phone #: ###-#### PLEASE CALL 1ST
BLD02-00019 BLD-Framing/Rough-in7/22/20027/23/20027/23/2002 12:00:00 AMAPART
shear ok. 7/23/2002 11:09:03 AM
BLD02-01377 BLD-Final7/22/20027/23/20027/23/2002 12:00:00 AMAFAIL
###-#### could you call first, he is only 15 min. away. bolt size at top truss connection min 3/4.. 7/23/2002 10:30:07 AM
MEC02-01910 Rough-in7/22/20027/23/20027/23/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/22/2002 at 14:33:11. Contact: ###-####.seal return chase at new water line added , floor joist. 7/23/2002 2:05:18 PM 7/23/2002 2:05:36 PM
MEC02-01910 Pressure Test7/22/20027/23/20027/23/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/22/2002 at 14:33:33. Contact: ###-####.
BLD02-01145 BLD-Final7/22/20027/23/20027/23/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 07/22/2002 at 16:51:44. Contact: ###-####.after 2. 7/23/2002 11:34:09 AMwould be ok for perm oc if fire life safety would approve. 7/23/2002 3:15:21 PM
BLD02-01365 BLD-Final7/23/20027/23/20027/23/2002 12:00:00 AMPFAIL
dennis. need unisex signage on restrooms as per plans , remove shelving from rest room for 5 foot clearance, and secure shelving to walls. also needs fire insp. 7/23/2002 1:27:02 PM
BLD02-01133 BLD-Framing/Rough-in7/23/20027/23/20027/23/2002 12:00:00 AMPPASS