BLD01-02542 BLD-Final7/22/20027/23/20027/23/2002 12:00:00 AMAPASS
chris ###-#### this was to only inspection done on this project 7/23/2002 9:46:23 AM
BLD01-02721 BLD-Final7/22/20027/23/20027/23/2002 12:00:00 AMAPASS
chris ###-#### this was the only inspection done on this project 7/23/2002 9:57:17 AM
BLD02-00880 BLD-Footing7/22/20027/23/20027/23/2002 12:00:00 AMAPART
###-#### JIM need plot plan on site at foundation inspection 7/23/2002 8:55:59 AM
BLD02-00881 BLD-Footing7/22/20027/23/20027/23/2002 12:00:00 AMAPART
###-#### JIM need plot plan on site at foundation inspection 7/23/2002 8:56:28 AM
BLD02-01644 BLD-Footing7/23/20027/23/20027/23/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/23/2002 at 06:23:18. Contact: ###-####. work in progress setbacks ok 7/23/2002 9:30:13 AM
BLD01-00715 BLD-Final7/22/20027/23/20027/23/2002 12:00:00 AMAPASS
###-#### ralph c.c # 17608 issued 7/23/2002 9:15:28 AM
BLD02-00155 BLD-Footing7/22/20027/23/20027/23/2002 12:00:00 AMPPART
mel; Phone #: ###-#### mti on site to test conc and inspect rebar 7/23/2002 4:26:34 PM
BLD02-00155 BLD-Foundation7/22/20027/23/20027/23/2002 12:00:00 AMPPART
mel; Phone #: ###-####
BLD02-00431 BLD-Framing/Rough-in7/23/20027/23/20027/23/2002 12:00:00 AMPPART
nailing \\###-#### shear nailing everything ok but for the back of the vault wall and two hold downs on the sw corners 7/23/2002 1:36:41 PM
BLD01-02952 BLD-Final7/23/20027/23/20027/23/2002 12:00:00 AMPPASS
###-#### mti o site to test conc and inspect rebar 7/23/2002 4:27:05 PM
BLD02-01291 BLD-Framing/Rough-in7/23/20027/23/20027/23/2002 12:00:00 AMPPART
ceiling grid- steve -###-#### ok to drop in ceiling panels 7/23/2002 1:57:40 PM
MEC02-02005 Final7/23/20027/23/20027/23/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/23/2002 at 10:55:45. Contact: ###-####.
BLD02-00069 BLD-Conference7/23/20027/23/20027/23/2002 12:00:00 AMPDONE