FIR03-00197
| FIR-Aging Inspection | 7/23/2003 | 7/23/2003 | 7/23/2003 12:00:00 AM | | FAIL |
|
|
I left message with the secretary for George or Greg to call me back about the status of the project 7/23/2003 1:27:31 PM
|
BLD02-02999
| FIRE-Alarm Testing | 7/21/2003 | 7/23/2003 | 7/23/2003 12:00:00 AM | A | CANC |
|
|
ED; Phone #: ###-#### Per contractor the phone lines are not in yet 7/23/2003 10:39:52 AM
|
BLD02-03001
| FIRE-Final Inspection | 7/21/2003 | 7/23/2003 | 7/23/2003 12:00:00 AM | A | CANC |
|
|
ED; Phone #: ###-#### Per the contractor the phone lines are not in 7/23/2003 10:40:41 AM
|
FIR03-00376
| INSP-Conference | 7/23/2003 | 7/23/2003 | 7/23/2003 12:00:00 AM | P | CANC |
|
|
underground not ready 7/24/2003 7:37:03 AM
|
BLD03-00830
| FIRE-Conference | 7/23/2003 | 7/23/2003 | 7/23/2003 12:00:00 AM | P | DONE |
|
|
Went over exit sign and emergency light locations for the second floor. Rick or I need to provide clarification on door magnets, releasing, to the members only area. Told Scott the contractor to provide fire extinguishers especially since welding is going on in building 7/24/2003 12:10:29 PM
|
FIR03-00386
| INSP-Sprinkler Rough-in | 7/23/2003 | 7/23/2003 | 7/23/2003 12:00:00 AM | P | PASS |
|
|
sprinkler piping is ok to cover 7/24/2003 7:37:30 AM
|
BLD03-01041
| FIRE-Final Inspection | 7/23/2003 | 7/23/2003 | 7/23/2003 12:00:00 AM | P | PASS |
|
|
life safety finaled 7/23/2003 1:19:05 PM
|
BLD01-02177
| FIRE-Final Inspection | 7/23/2003 | 7/23/2003 | 7/23/2003 12:00:00 AM | P | PASS |
|
|
fire life safety finaled
|