Inspections for the day of: Monday, July 23, 2007.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR07-00345 FIR-Aging Inspection7/23/20077/23/20077/31/2007 11:52:06 AM NR
work is in progress
FIR06-00011 INSP-Alarm Testing7/22/20077/23/20077/23/2007 5:45:45 PMPPASS
See the city approved plans for the items on the third floor that I inspected. The third floor is now nearly complete. The contractor wanted to move on to the Penthouse but of the 20 induct detectors 6 of them had operational issues that the hvac contractor was trying to sort out. I declined to continue on until the contractor was ready.
FIR07-00427 INSP-Sprinkler Rough-in7/23/20077/23/20077/23/2007 5:42:41 PMPPART
The underground supply piping is ok to cover. The piping has only been buried at 4' but per the contractor the additional required 6" will be supplied by building up the ground cover. This will be verified at the sprinkler rough-in.
BLD07-00064 FIRE-Final Inspection7/23/20077/23/20077/23/2007 5:41:06 PMPFAIL
The duct smoke detectors tested ok but the exit sign and emergency lighting in the kitchen was not done yet.
FIR07-00479 INSP-Sprinkler Rough-in7/23/20077/23/20077/23/2007 5:40:04 PMPPART
The six sprinkler heads in the corridor junction are ok to cover.
BLD06-01463 FIRE-Final Inspection7/23/20077/23/20077/23/2007 5:39:09 PMPFAIL
The exit signs still do not operate on battery backup.
FIR07-00608 INSP-Sprinkler Rough-in/Hydro7/20/20077/23/20077/23/2007 5:38:19 PMAPASS
Permit finaled