FIR07-00527
| INSP-Final Inspection | 7/23/2008 | 7/23/2008 | 7/23/2008 3:50:16 PM | P | PASS |
|
|
Permit finaled
|
FIR08-00026
| INSP-Final Inspection | 7/23/2008 | 7/23/2008 | 7/23/2008 3:16:26 PM | P | PASS |
|
|
Permit finaled
|
FIR08-00148
| INSP-Sprinkler Rough-in/Hydro | 7/22/2008 | 7/23/2008 | 7/23/2008 2:02:01 PM | A | PASS |
|
|
UG hydro test passed.
|
FIR08-00239
| INSP-Sprinkler Rough-in | 7/22/2008 | 7/23/2008 | 7/23/2008 12:10:02 PM | A | FAIL |
|
|
The first floor plans do not match the installation. No of the piping shown on the basement plans had sizing. Bracing was not complete on the standpipes. Basically no inspection was performed.
|
BLD08-01322
| FIRE-Final Inspection | 7/22/2008 | 7/23/2008 | 7/23/2008 11:32:06 AM | A | PASS |
|
|
Fire life safety passed
|