ESC09-00104
| General Inspection | 7/23/2009 | 7/23/2009 | 7/23/2009 3:53:53 PM | P | PASS |
|
|
looked ok
|
ESC07-01432
| General Inspection | 7/23/2009 | 7/23/2009 | 7/23/2009 3:51:53 PM | P | PASS |
|
|
looked ok
|
ELE09-00264
| Electrical Rough-In | 7/23/2009 | 7/23/2009 | 7/23/2009 3:51:11 PM | P | PASS |
|
|
john Phone #: ###-#### met owner, called contractor, additional ground rod has been installed, this completes ri only so not noted as "part", no esc this project
|
ELE08-02423
| Final | 7/23/2009 | 7/23/2009 | 7/23/2009 3:25:14 PM | P | PASS |
|
|
JASON BLDG 3 L1 UNITS D EAST, D WEST & D.1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy 3 units only ok to final, no card signed, will need new permit for further construction activity
|
ELE09-00694
| Electrical Rough-In | 7/23/2009 | 7/23/2009 | 7/23/2009 2:50:05 PM | P | PART |
|
|
hv only ok for main office ceilings, not to be covered, lv wiring not plenum rated, will call for later inspection, met and inspected with 412
|
ELE09-01167
| Electrical Rough-In | 7/23/2009 | 7/23/2009 | 7/23/2009 12:58:35 PM | P | PASS |
|
|
stu - underground - please call 1/2 hr prior Phone #: ###-#### ok to pour slab only for building
|
ELE09-01086
| Electrical Rough-In | 7/22/2009 | 7/23/2009 | 7/23/2009 12:34:28 PM | P | PART |
|
|
John Phone-he might be out back #: ###-#### u/g only ok to cover, no esc this project
|
ELE09-01328
| Final | 7/22/2009 | 7/23/2009 | 7/23/2009 11:38:24 AM | A | FAIL |
|
|
Please call Bryan prior to inspection Phone #: ###-#### Internet Inspection Request from: Bryan Atkins called contractor, left correction notice, NEC 406.8(B) receptacles shall be listed weather resistant type, 250.53(B) electrodes shall be not less than 6' apart, 250.53(G) electrodes shall be at least 8' long and deep, 312.5 conductors entering enclosure shall be protected from abrasion by approved method, 110.12(B) there shall be no broken parts, damaged hasp, receptacles, BCC there shall be no foreign material (bee hives) inside enclosure, shall permit for correct use- t/s or p/s, job id sticker shall be posted, fee due
|
ELE08-03055
| Electrical Rough-In | 7/22/2009 | 7/23/2009 | 7/23/2009 9:29:39 AM | A | PASS |
|
|
unit 552-Travis is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ric ok, up and down
|
ELE09-01322
| Final | 7/22/2009 | 7/23/2009 | 7/23/2009 8:54:58 AM | A | CANC |
|
|
Future Red Box Circuit Phone #: ###-#### Internet Inspection Request from: Robert Jangula called contractor see comments for ELE09-01321
|
ELE09-01321
| Final | 7/22/2009 | 7/23/2009 | 7/23/2009 8:48:49 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Robert Jangula called contractor, told that ri required before cover, requires appointment to meet electrician to do 2 permits for inspection, fee due, will cancel inspection for other inspection request, NEC violations: 300.11(B)(1) raceways shall only be used as means of support for cable if identified for the purpose, 110.12(B) panel shall not be damaged and shall readily be able to open, 300.14 at least 6" of free conductor shall be provided where it emerges from raceway, BCC shall supply fire caulking where penetrate fire wall, shall not cover before inspection, NOTE: this is partial only- need to see rest of work
|