FIR11-00645
| INSP-Sprinkler Rough-in/Hydro | 7/23/2012 | 7/23/2012 | 7/23/2012 4:22:21 PM | P | PART |
|
|
Overhead rough-in inspection completed. Noted six additional heads below ductwork, one added head in each stairway, one extra branchline below a soffit.
|
BLD12-01244
| FIRE-Final Inspection | 7/23/2012 | 7/23/2012 | 7/23/2012 4:17:59 PM | P | PASS |
|
|
Fire life safety inspection completed satisfactory.
|
FIR12-00329
| INSP-Final Inspection | 7/23/2012 | 7/23/2012 | 7/23/2012 4:16:19 PM | P | PASS |
|
|
Fire sprinkler work passed final inspection. Permit finaled.
|
BLD12-01771
| FIRE-Final Inspection | 7/20/2012 | 7/23/2012 | 7/23/2012 4:15:05 PM | A | FAIL |
|
|
Noted correction items include; post door to remain unlocked signage at the west main entry/exit doors and remove keyed locking hardware at the first set of vestibule doors, provide approved lever set at the kitchen exit door, relocate fire extinguisher at the second level executive offices to a normal path of travel, post signage at the pool gates, remove keyed lock at the excersise room, post building address numbers as discussed, repair EM lights at four locations. See also list of general requirements attatched to the permit documents for plan review conditions.
|