BLD13-01986
| BLD-Final | 7/23/2013 | 7/23/2013 | 7/23/2013 4:32:50 PM | P | PEND |
|
|
Bob ###-#### C/N issued .... Verify coach Mfg. prior to July 15, 1976 or Provide rehabilitation Certificate from the state of Idaho. Need Electr and Plumb finals. Call for Block and Tie insp. after completing above items.
|
BLD12-02399
| BLD-Final | 7/22/2013 | 7/23/2013 | 7/23/2013 4:26:27 PM | A | NR |
|
|
need to close out grading permit...you finaled the new building under Bld12-02045 Called Dave .........Told him to get Public Works final......... Then call for Erosion control and Structural final.
|
BLD13-01745
| BLD-Framing/Rough-in | 7/23/2013 | 7/23/2013 | 7/23/2013 2:22:16 PM | P | PASS |
|
|
Jason Phone #: ###-####
|
BLD13-01665
| BLD-Footing | 7/23/2013 | 7/23/2013 | 7/23/2013 2:20:36 PM | P | PASS |
|
|
pat Phone #: ###-####
|
BLD13-01718
| BLD-Final | 7/23/2013 | 7/23/2013 | 7/23/2013 2:18:45 PM | P | NR |
|
|
Need fire final.
|
BLD13-01047
| BLD-Final | 7/22/2013 | 7/23/2013 | 7/23/2013 2:17:31 PM | P | NR |
|
|
dan Phone #: ###-#### Need fire final.
|
BLD13-01536
| BLD-Foundation | 7/23/2013 | 7/23/2013 | 7/23/2013 2:16:39 PM | P | PASS |
|
|
dane Phone #: ###-####
|
BLD13-01260
| BLD-Framing/Rough-in | 7/22/2013 | 7/23/2013 | 7/23/2013 2:15:52 PM | A | NR |
|
|
mike Phone #: ###-#### Need to move door to allow for 48" in front of existing door .....Just North of new room.
|
BLD13-01267
| BLD-Footing | 7/22/2013 | 7/23/2013 | 7/23/2013 10:12:54 AM | A | PASS |
|
|
Keith Phone #: ###-####
|
BLD12-03211
| BLD-Framing/Rough-in | 7/22/2013 | 7/23/2013 | 7/23/2013 10:11:31 AM | A | PART |
|
|
ceiling grid inspection 2nd floor-Russ Phone #: 871-094 2nd Flr ceiling grid....OK.
|
BLD13-01986
| BLD-Final | 7/22/2013 | 7/23/2013 | 7/23/2013 9:48:50 AM | A | CANC |
|
|
Bob Phone #: ###-#### Re-sched for PM.
|
ESC13-00564
| Site Preparation | 7/22/2013 | 7/23/2013 | 7/23/2013 8:48:01 AM | A | PASS |
|
|
Michah phone
|
MIS13-00205
| DOC - Permit Finaled | 7/23/2013 | 7/23/2013 | 7/23/2013 7:36:41 AM | P | PASS |
|
|
|