FIR13-00110
| INSP-Final Inspection | 7/18/2013 | 7/23/2013 | 7/29/2013 10:01:40 AM | P | FAIL |
|
|
Final pending additional coverage at adjoining guestrooms 312/314, room smokes to report as a supervisory condition, provide as-builts reflecting actual ADA room locations and correct CO addresses, post points map at the panel.
|
BLD12-03273
| FIRE-Final Inspection | 7/22/2013 | 7/23/2013 | 7/26/2013 3:47:34 PM | P | NR |
|
|
Pending project related fire alarm
|
FIR13-00148
| INSP-Final Inspection | 7/22/2013 | 7/23/2013 | 7/26/2013 3:46:38 PM | P | NR |
|
|
CALL BRAD IN TVFP OFFICE IF ANY QUESTIONS.BARD ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt
|
FIR12-00605
| INSP-Sprinkler Rough-in/Hydro | 7/23/2013 | 7/23/2013 | 7/25/2013 8:14:02 AM | P | PART |
|
|
UG fire supply line hydrostatic test completed
|
BLD13-01097
| FIRE-Final Inspection | 7/23/2013 | 7/23/2013 | 7/25/2013 8:12:45 AM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR13-00247
| INSP-Final Inspection | 7/23/2013 | 7/23/2013 | 7/23/2013 1:24:31 PM | P | PASS |
|
|
Inspection passed. Fire sprinkler permit finaled.
|
FIR13-00253
| INSP-Final Inspection | 7/23/2013 | 7/23/2013 | 7/23/2013 1:22:49 PM | P | PASS |
|
|
Fire sprinkler work passed final walkthrough. Permit finaled.
|
BLD13-00882
| FIRE-Final Inspection | 7/22/2013 | 7/23/2013 | 7/23/2013 1:21:58 PM | A | PASS |
|
|
C/N items are finished. Life safety passed.
|
FIR13-00116
| INSP-Final Inspection | 7/22/2013 | 7/23/2013 | 7/23/2013 1:21:07 PM | A | PART |
|
|
Okay to cover remainder of the drop ceilings in the conference room, ssu relocated. Final pending riser supervision.
|
BLD13-01657
| FIRE-Final Inspection | 7/22/2013 | 7/23/2013 | 7/23/2013 1:18:52 PM | A | NR |
|
|
Final pending project related fire sprinkler system modifications.
|