Inspections for the day of: Tuesday, July 23, 2013.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00110 INSP-Final Inspection7/18/20137/23/20137/29/2013 10:01:40 AMPFAIL
Final pending additional coverage at adjoining guestrooms 312/314, room smokes to report as a supervisory condition, provide as-builts reflecting actual ADA room locations and correct CO addresses, post points map at the panel.
BLD12-03273 FIRE-Final Inspection7/22/20137/23/20137/26/2013 3:47:34 PMPNR
Pending project related fire alarm
FIR13-00148 INSP-Final Inspection7/22/20137/23/20137/26/2013 3:46:38 PMPNR
CALL BRAD IN TVFP OFFICE IF ANY QUESTIONS.BARD ###-#### Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt
FIR12-00605 INSP-Sprinkler Rough-in/Hydro7/23/20137/23/20137/25/2013 8:14:02 AMPPART
UG fire supply line hydrostatic test completed
BLD13-01097 FIRE-Final Inspection7/23/20137/23/20137/25/2013 8:12:45 AMPPASS
Fire life safety inspection passed.
FIR13-00247 INSP-Final Inspection7/23/20137/23/20137/23/2013 1:24:31 PMPPASS
Inspection passed. Fire sprinkler permit finaled.
FIR13-00253 INSP-Final Inspection7/23/20137/23/20137/23/2013 1:22:49 PMPPASS
Fire sprinkler work passed final walkthrough. Permit finaled.
BLD13-00882 FIRE-Final Inspection7/22/20137/23/20137/23/2013 1:21:58 PMAPASS
C/N items are finished. Life safety passed.
FIR13-00116 INSP-Final Inspection7/22/20137/23/20137/23/2013 1:21:07 PMAPART
Okay to cover remainder of the drop ceilings in the conference room, ssu relocated. Final pending riser supervision.
BLD13-01657 FIRE-Final Inspection7/22/20137/23/20137/23/2013 1:18:52 PMANR
Final pending project related fire sprinkler system modifications.