Inspections for the day of: Tuesday, July 23, 2013.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKimberly M. Johnson
TitleEROSION CONTROL
Phone #208-794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-01218 General Inspection7/23/20137/23/20137/24/2013 7:58:51 AM PASS
finaled
ESC12-00688 Aging Inspection7/23/20137/23/20137/23/2013 1:42:48 PM PASS
Permit finaled. No activity since July 2012.
ESC12-00688 DOC - Permit Finaled7/23/20137/23/20137/23/2013 1:42:34 PMPPASS
Permit finaled. No activity since July 2012.
ESC12-00640 Aging Inspection7/23/20137/23/20137/23/2013 1:14:12 PM CANC
permit finaled
ESC12-00908 Aging Inspection7/23/20137/23/20137/23/2013 11:36:01 AM PASS
ESC12-01217 General Inspection7/23/20137/23/20137/23/2013 11:28:11 AM PASS
Backyard where hillside is located is undisturbed.
ESC12-01189 General Inspection7/23/20137/23/20137/23/2013 11:15:28 AM PART
perimeter control in place and in good condition. Need to containerize trash
ESC13-00002 General Inspection7/23/20137/23/20137/23/2013 10:56:14 AM PASS
ESC12-01199 General Inspection7/23/20137/23/20137/23/2013 10:45:15 AM PASS
ESC12-00716 Aging Inspection7/23/20137/23/20137/23/2013 9:40:30 AM PASS
Looks final; BLD still open
ESC12-00835 Aging Inspection7/23/20137/23/20137/23/2013 9:31:06 AM PASS
Finaled
ESC12-00835 DOC - Permit Finaled7/23/20137/23/20137/23/2013 9:30:46 AMPPASS
ESC13-00434 Random Inspection7/23/20137/23/20137/23/2013 9:24:06 AMPPASS
ESC13-00108 General Inspection7/23/20137/23/20137/23/2013 9:05:33 AM FAIL
Clean out DI in front of house. Instruct crews on proper washout location; clean up illicit washout on ground on east side of house.
ESC13-00085 General Inspection7/23/20137/23/20137/23/2013 8:59:30 AM PASS
Close to final
ESC12-01221 DOC - Permit Finaled7/23/20137/23/20137/23/2013 8:58:24 AMPPASS
ESC13-00076 General Inspection7/23/20137/23/20137/23/2013 8:57:10 AM PASS
ESC12-01145 General Inspection7/23/20137/23/20137/23/2013 8:46:37 AM PART
Two days of concrete work left to do; washout is contained on site but is not contained in a centralized pit. Currently working on ROW and driveways so stabilized construction exits have been removed but no issues with tracking at time of inspection. Silt fence along north side has been replaced with curb and cut. ESC sign has been weathered and needs re-written. Water truck on site for dust control; no issues with dust at time of inspection.