ESC13-00684
| General Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 3:41:57 PM | | PASS |
|
|
Antelope Springs is near completion and parcels will soon be survey and recorded. No trackout to Warm Springs, the Walling Creek bank has revegetated/stabilized.
Discussed project with RP/developer Pat and he stated this evening a sweeping is doing the culdesac and the stretch of Warm Springs in front the development.
No corrections if sweeping is completed this week.
|
ESC14-00144
| General Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 3:37:48 PM | P | PASS |
|
|
Fugitive dust conditions are much improved today. The suppressant is working fairly well but more important factors seem to speed of trucks on haul road and water application.
Will need to have a water truck full time at site as the mag chloride breaks down.
|
ESC14-00403
| Site Preparation | 7/23/2014 | 7/23/2014 | 7/23/2014 2:38:31 PM | P | PASS |
|
|
There is more that 50 feet of buffer as well vegetation between stockpile and Warm Springs creek Most of stockpile will be offhauled if not backfilled.
Permit posted. No trackout from dump trucks. Approved.
|
ESC14-00155
| DOC - Permit Finaled | 7/23/2014 | 7/23/2014 | 7/23/2014 2:25:49 PM | P | PASS |
|
|
House demo complete. New home excavation has started and is covered under new permit ESC14-00403.
|
ESC14-00401
| General Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 10:26:17 AM | | PART |
|
|
Irving St is clean but Raymond still needs sweeping and maintenance on sidewalk and gutter. DI bag on Irving was emptied and reinstalled last week.
Issued another verbal CN to Jeremy Amar to clean gutters.
|
ESC14-00409
| General Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 10:12:08 AM | | PASS |
|
|
|
ESC14-00410
| General Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 10:11:20 AM | | PASS |
|
|
|
ESC14-00411
| General Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 10:10:39 AM | | PASS |
|
|
Landmark apartment site development is in progress. Water truck onsite to control dust. No trackout to Hackamore. Also applies to ESC14 -00409 -00410.
|
ESC13-00304
| Aging Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 10:04:13 AM | | PASS |
|
|
Finaled.
|
ESC13-00304
| DOC - Permit Finaled | 7/23/2014 | 7/23/2014 | 7/23/2014 10:04:04 AM | P | PASS |
|
|
No construction acitivity. No earth disturbance on site. BLD finaled. Not clear if project ever occurred as there are no antennas on top of roof. Permit expired.
|
ESC14-00646
| Random Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 9:18:01 AM | P | PASS |
|
|
Work on roadside berm is in progress. No track out and MS4 DIs in front of project have coir mat protection. No violations observed.
|
ESC13-00923
| Aging Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 9:16:18 AM | | PASS |
|
|
Finaled.
|
ESC13-00923
| DOC - Permit Finaled | 7/23/2014 | 7/23/2014 | 7/23/2014 9:16:02 AM | P | PASS |
|
|
Work is complete. No exterior disturbance or construction activity observed. CO has been issued for work area but the BLD is not yet finaled. No further ESC inspections necessary.
|
ESC14-00263
| General Inspection | 7/23/2014 | 7/23/2014 | 7/23/2014 8:46:48 AM | | PASS |
|
|
Finaled.
|
ESC14-00263
| DOC - Permit Finaled | 7/23/2014 | 7/23/2014 | 7/23/2014 8:46:38 AM | P | PASS |
|
|
Structure has been attached to the back of B&D Foods warehouse. The surrounding area is a gravel lot. No drainage structures. ESC conditions satisfied, no further consrtuction.
|
ESC14-00622
| Site Preparation | 7/22/2014 | 7/23/2014 | 7/23/2014 8:34:40 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner
Flat site, no adajacent surface water. Permit is posted with contact info, will need to be moved or posted on sign when hole is dug. Downstream MS4 DI has filter protection.
Main BMP will be daily housekeeping. Approved.
|
ESC14-00144
| BMP Violation | 7/23/2014 | 7/23/2014 | 7/23/2014 8:26:51 AM | A | PASS |
|
|
SWO corrections have been addressed.
Corrections made: 1. Magnesium chloride dust suppressant has been applied on the entire loop of the haul road to and from Warm Springs to stockpile area. 2. Water trucks will be used 1 x per hour and will increase as necessary. 3. At time of inspection no dust created by truck traffic. 4. Mr. Conger stated Warm Springs will be swept at end of the day in front of East Valley and Harris Ranch.
Approved to continue work. Will check in later today when conditions are hotter and drier to see if mag chloride is effective.
|
ESC13-00970
| Site Final | 7/16/2014 | 7/23/2014 | 7/22/2014 10:56:49 AM | P | FAIL |
|
|
See if DI bag and tarp protecting swale have been removed as requested. Home construction is complete.
No corrections made. No response from RP. 2nd notice given to Justin from Sunrise.
|