FIR14-00603
| INSP-Sprinkler Rough-in | 7/23/2015 | 7/23/2015 | 7/24/2015 12:42:15 PM | P | PASS |
|
|
24 hour air test passed/complete on both dry systems in parking structure.
|
FIR14-00815
| INSP-Conference | 7/23/2015 | 7/23/2015 | 7/23/2015 3:19:18 PM | P | DONE |
|
|
Spoke with General contractor, approved for moving in furniture to building, sprinkler systems are to remain active, no tenant or overnight occupancy allowed until final certificate of occupancy is issued.
|
BLD15-01589
| FIRE-Final Inspection | 7/23/2015 | 7/23/2015 | 7/23/2015 3:07:10 PM | P | FAIL |
|
|
City approved drawings and small documents not on site, general contractor will shedule new inspection when approve drawings are provided.
|
FIR15-00096
| INSP-Sprinkler Rough-in | 7/22/2015 | 7/23/2015 | 7/23/2015 11:36:08 AM | A | PART |
|
|
Inspected drop down ceiling area's in rooms 504, 508, 516, 531, 533, 538, 539, approved for cover
|
FIR15-00460
| INSP-Sprinkler Rough-in/Hydro | 7/22/2015 | 7/23/2015 | 7/23/2015 10:48:34 AM | A | PASS |
|
|
Rough in inspection passed/complete, approved for cover.
|
FIR14-00792
| INSP-Sprinkler Rough-in | 7/22/2015 | 7/23/2015 | 7/23/2015 10:08:46 AM | A | PART |
|
|
RTC inspection for Bldg H 2nd floor hard lid areas - see plans for areas inspected today. OK to cover pipe in these areas.
|