MEC18-02192
| Conference | 7/23/2018 | 7/23/2018 | 7/23/2018 1:09:26 PM | P | DONE |
|
|
Request for conference/consult. Please contact Rob with any questions or concerns. ###-#### Phone #: ###-#### Inspection - conference discussing fire damper access
|
MEC18-02249
| Final | 7/23/2018 | 7/23/2018 | 7/23/2018 12:01:58 PM | A | PASS |
|
|
|
MEC18-02243
| Final | 7/20/2018 | 7/23/2018 | 7/23/2018 10:20:14 AM | A | CANC |
|
|
Final inspection needed AM Monday contact David for access to building ###-####. 2nd floor final inspection. Phone #: ###-#### Inspection requested via web by Karl Hestekin - Not ready for a final. This should have been scheduled as rough in for ceiling cover. I put one in for it.
|
MEC18-02243
| Rough-in | 7/23/2018 | 7/23/2018 | 7/23/2018 10:18:57 AM | A | PASS |
|
|
Final inspection needed AM Monday contact David for access to building ###-####. 2nd floor final inspection. Phone #: ###-#### Inspection requested via web by Karl Hestekin - Okay to cover grid ceilings
|
MEC18-03382
| Pressure Test | 7/20/2018 | 7/23/2018 | 7/23/2018 9:54:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt - 20lb gas, 5lb flue pass
|
MEC18-03382
| Rough-in | 7/20/2018 | 7/23/2018 | 7/23/2018 9:54:02 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt - 1) Exhuast fans not connected to vents 2) Crawl needs to be completed 3) Need to use manufactures nail plates on CSST
|
MEC18-03378
| Pressure Test | 7/20/2018 | 7/23/2018 | 7/23/2018 9:52:50 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt - 20Lb gas pass, 5lb flue fail
|
MEC18-03378
| Rough-in | 7/20/2018 | 7/23/2018 | 7/23/2018 9:52:15 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Aaron Alandt - 1) Exhaust fans not connected to vents 2) Crawl needs to be completed 3) Dryer vent is sticking outside of framing due to electrical box 4) Flue pressure fail 5) Need to use manufactures nail plates on CSST
|