ELE20-02384
| Electrical Rough-In | 7/23/2020 | 7/23/2020 | 7/23/2020 2:04:18 PM | P | PASS |
|
|
Electrical Rough-In Phone #: ###-#### Inspection requested via web by Tyler Ridley Inspection done by pictures
|
ELE20-02553
| Final | 7/23/2020 | 7/23/2020 | 7/23/2020 1:37:53 PM | P | PASS |
|
|
Ron- */Screened*/ - Inspection done outside Phone #: ###-#### p/s o/h rec ok Replaced mast and must use a support wire for final
|
ELE20-02552
| Final | 7/22/2020 | 7/23/2020 | 7/23/2020 1:13:48 PM | P | PASS |
|
|
This is in a storage building west of the dealership offices, alongside I84. Call me and I can guide you to it over the phone, or with enough advance notice I can meet you there. Phone #: ###-#### Inspection requested via web by Dan Hilke Final ok for mini split unit
|
ELE20-01962
| Electrical Rough-In | 7/22/2020 | 7/23/2020 | 7/23/2020 11:06:46 AM | A | PASS |
|
|
Mike and Rick will be on site. Need cover inspection on wall with the two electrical panels. Thanks Phone #: ###-#### Inspection requested via web by Lynn Cable Panel wall only ok to cover
|
ELE20-02455
| Final | 7/22/2020 | 7/23/2020 | 7/23/2020 11:06:13 AM | A | PASS |
|
|
Changed out disconnect 200amp single phase overhead. Phone #: ###-#### Inspection requested via web by Kendra Lanham Final ok
|
ELE20-02421
| Final | 7/22/2020 | 7/23/2020 | 7/23/2020 9:38:20 AM | A | PASS |
|
|
New break room outlets Phone #: ###-#### Inspection requested via web by Greg Idsinga Occ card signed-Final ok
|
ELE20-01777
| Electrical Rough-In | 7/23/2020 | 7/23/2020 | 7/23/2020 9:34:32 AM | A | CANC |
|
|
Please call Caleb with any questions or concerns. Phone #: ###-#### Inspection requested via web by Caleb Gaylord New wall needs added and photos to be sent once complete
|
ELE19-04099
| Electrical Rough-In | 7/23/2020 | 7/23/2020 | 7/23/2020 9:09:16 AM | A | PASS |
|
|
1st and 2nd floor ceiling drops Phone #: ###-#### Inspection requested via web by Todd Hall 1st and 2nd floor drop ceilings ok to cover
|