BLD19-00556
| BLD-Final | 7/22/2020 | 7/23/2020 | 7/23/2020 4:41:45 PM | P | FAIL |
|
|
Damon - */Screened*/ Phone #: ###-####//need to have hard surface turnaround per plans or provide approval from zoning//currently only a 20 foot drive connected to common driveway//
|
BLD19-00556
| BLD-Blower Door Test Results | 7/23/2020 | 7/23/2020 | 7/23/2020 4:19:23 PM | P | DONE |
|
|
5.9 ACH 50
|
BLD19-04651
| BLD-Blower Door Test Results | 7/23/2020 | 7/23/2020 | 7/23/2020 4:17:16 PM | P | NR |
|
|
|
BLD19-04651
| BLD-Final | 7/22/2020 | 7/23/2020 | 7/23/2020 4:16:58 PM | P | NR |
|
|
Damin *screened* Phone #: ###-####
|
BLD19-04773
| BLD-Framing/Rough-in | 7/23/2020 | 7/23/2020 | 7/23/2020 3:39:01 PM | P | PART |
|
|
framing/foam seal Phone #: ###-#### Inspection requested via web by Shane Shade//see Crystal and Shane onsite for list of corrections//ok to insulate in areas not affected by corrections//
|
BLD19-04772
| BLD-Framing/Rough-in | 7/23/2020 | 7/23/2020 | 7/23/2020 3:38:38 PM | P | PART |
|
|
framing/foam seal Phone #: ###-#### Inspection requested via web by Shane Shade//see Crystal and Shane onsite for list of corrections//ok to insulate in areas not affected by corrections//
|
BLD19-04770
| BLD-Framing/Rough-in | 7/23/2020 | 7/23/2020 | 7/23/2020 3:38:19 PM | P | PART |
|
|
framing/foam seal Phone #: ###-#### Inspection requested via web by Shane Shade//see Crystal and Shane onsite for list of corrections//ok to insulate in areas not affected by corrections//
|
BLD19-04767
| BLD-Framing/Rough-in | 7/23/2020 | 7/23/2020 | 7/23/2020 3:37:57 PM | P | PART |
|
|
Framing/foam seal Phone #: ###-#### Inspection requested via web by Shane Shade//see Crystal and Shane onsite for list of corrections//ok to insulate in areas not affected by corrections//
|
BLD20-01673
| BLD-Footing | 7/23/2020 | 7/23/2020 | 7/23/2020 3:28:02 PM | P | FAIL |
|
|
screened // Michael Phone #: ###-####//need approved plans onsite for inspection//will need to sleeve the sewer line through both footings//
|
BLD19-00535
| BLD-Wall Bracing | 7/23/2020 | 7/23/2020 | 7/23/2020 2:53:03 PM | P | PASS |
|
|
Interior gype shear walls all floors . Phone #: ###-#### Inspection requested via web by Lee Scott//nailing ok on interior shear walls//
|
BLD20-00225
| BLD-Framing/Rough-in | 7/23/2020 | 7/23/2020 | 7/23/2020 2:52:19 PM | P | PASS |
|
|
Vinny- */Screened*/ Phone #: ###-####//ok to insulate//
|
BLD20-00337
| BLD-Concrete | 7/23/2020 | 7/23/2020 | 7/23/2020 1:07:06 PM | P | PART |
|
|
Chase *screened* Phone #: ###-####//last of area A slab, ok pending special inspections//east part of area B slab, vapor barrier ok, no wire mesh installed yet--pend specials//
|
BLD20-01097
| BLD-Wall Bracing | 7/23/2020 | 7/23/2020 | 7/23/2020 12:30:17 PM | P | NR |
|
|
Add hot dip nails at all pt plate//nail blocking on shear locations and to top plates//
|
BLD20-01097
| BLD-Framing/Rough-in | 7/22/2020 | 7/23/2020 | 7/23/2020 12:29:25 PM | P | CANC |
|
|
screened // Leslie Phone #: ###-####//NR needs wall bracing//
|
BLD20-00344
| BLD-Ceiling Grid Inspection | 7/22/2020 | 7/23/2020 | 7/23/2020 11:40:20 AM | A | PART |
|
|
Request to lay ceiling tiles in areas with passed overhead inspections Phone #: ###-#### Inspection requested via web by Miles Gastil//ok to cover grid in phase one//
|
BLD20-01333
| BLD-Wall Bracing | 7/23/2020 | 7/23/2020 | 7/23/2020 11:39:12 AM | P | PART |
|
|
add staples in areas as discussed//add hot dipped nails to pt//ok to wrap when above complete//
|
BLD20-01333
| BLD-Framing/Rough-in | 7/22/2020 | 7/23/2020 | 7/23/2020 11:38:14 AM | P | NR |
|
|
As early as possible Phone #: 2086956570 >> Inspection requested via mobile web by Matt Swenson//needed wall bracing not framing//
|
BLD20-01018
| BLD-Framing/Rough-in | 7/22/2020 | 7/23/2020 | 7/23/2020 11:13:31 AM | A | NR |
|
|
ok with video or photo // Jim Phone #: ###-####//need electrical roughed in and inspected//mechanical needs roughed in and inspected//provide truss detail for connections to girders//
|
BLD19-00535
| BLD-Other | 7/22/2020 | 7/23/2020 | 7/23/2020 10:39:53 AM | A | PART |
|
|
Ok to cover drop ceilings levels 1 and 2 . Phone #: ###-#### Inspection requested via web by Lee Scott//drops ok to cover//lee will verify that mechanical is fire caulked on floor 2 and fire sprinkler mains into riser room are fire caulked//
|
BLD20-01529
| BLD-Framing/Rough-in | 7/22/2020 | 7/23/2020 | 7/23/2020 10:03:53 AM | A | PASS |
|
|
screened // Forrest Phone #: ###-####//no new penetrations in 2hr floor above--all penetrations are existing//demising walls will be patched where cut//trades approvals ok//will need grid cover inspection for back stock room area//
|
BLD20-02082
| BLD-Wall Bracing | 7/22/2020 | 7/23/2020 | 7/23/2020 9:08:49 AM | A | PART |
|
|
thank you Phone #: ###-#### Inspection requested via web by Dean Rhodes//existing let in bracing was left//only one wall reframed and this will meet prescirptive wall bracing requirements//other areas are all sheathed as fiber board was removed due to damage//add PT or rot resist sill at new framed wall--will check at framing//
|