PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, July 24, 1996
.
Number of inspections:
34
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Wes Worcester
Title
BLD-COM/RES INSPECTOR
Phone #
340-1490
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
BLD96-01141
INSP - Framing/Rough-in
7/23/1996
7/24/1996
7/25/1996 12:00:00 AM
P
FAIL
need plan on site, truss eng, nail shr
BLD96-01277
INSP - Framing/Rough-in
7/23/1996
7/24/1996
7/25/1996 12:00:00 AM
P
PART
BLD96-01332
INSP - Swimming pool
7/23/1996
7/24/1996
7/25/1996 12:00:00 AM
P
NR
poured w/o insp.. Pool contractor does not agree w/3" cover when cast against the earth as more "shotcrete" is needed because of vector analysis of lds from above. I ?'d ld brng soils etc.
BLD96-01686
INSP - Final
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
NH
MEC96-01602
INSP - Final
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
NH
MEC96-01602
INSP - Final
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
FAIL
plumbing c/n posted and structure locked
MEC96-01602
INSP - Final
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
NH
MEC96-01602
INSP - Final
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
FAIL
plumbing c/n posted and structure locked
BLD95-00644
INSP - Final
7/23/1996
7/24/1996
7/24/1996 12:00:00 AM
A
FAIL
9:30 A.M. WED. still not done w/previous c/n
BLD95-01754
INSP - Letter of compliance
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
PASS
issued l/c
BLD95-01754
INSP - Final
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
PASS
BLD95-01754
INSP - Letter of compliance
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
PASS
issued l/c
BLD96-00537
INSP - Foundation
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
NR
still trying to get cover requirements
BLD96-00537
INSP - Footings
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
FAIL
calls for dbl mat
BLD96-00537
INSP - Footings
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
NR
still trying to get cover
BLD96-00537
INSP - Conference
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
A
PART
dbl mat requirements
BLD96-00857
INSP - Carpentry
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PART
what I ck'd at front edge was ok. Kim supposedly ck'd two edges and middle area but did not sign anything, as per contractor
BLD96-00857
INSP - Conference
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PART
discussed plan w/steed rep
BLD96-01102
INSP - Conference
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PART
met w/Ted reference inadequate tji's end support and stud walls not perpendicular as per std const criteria.
BLD96-01102
INSP - Carpentry
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
FAIL
2x4 placed on edge on top of 4x hdr on outside wall under rim joist carrying roof ld from above. Inadequate brng of tji's as to end brng requirements quite probable....
BLD96-01102
INSP - Conference
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
FAIL
posted c/n as per Bob Archibald
BLD96-01102
INSP - Energy code compliance
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PART
already posted by someone
BLD96-01139
INSP - Final
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PASS
BLD96-01139
INSP - Letter of compliance
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PASS
l/c issued
BLD96-01139
INSP - Letter of compliance
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PASS
l/c issued
MEC96-01938
INSP - Rough-in & Gas Pressure
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PART
could not find but got directions from contractor to meet in am
BLD96-01164
INSP - Framing/Rough-in
7/23/1996
7/24/1996
7/24/1996 12:00:00 AM
P
FAIL
meeting truss eng rep on site 07/25/96
BLD96-01164
INSP - Framing/Rough-in
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PART
BLD96-01164
INSP - Conference
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PART
arch to address roof lds to dbl gdr truss as per phone call. Builder was also notified.
BLD96-01164
INSP - Carpentry
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PART
ok to insulate
BLD96-01686
INSP - Final
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PASS
BLD96-01686
INSP - Letter of compliance
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PASS
issued l/c
BLD96-01686
INSP - Letter of compliance
7/24/1996
7/24/1996
7/24/1996 12:00:00 AM
P
PASS
issued l/c
BLD96-01280
INSP - Framing/Rough-in
7/23/1996
7/24/1996
7/24/1996 12:00:00 AM
P
NR