BLD99-03737
| BLD-Final | 7/21/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | FAIL |
|
|
Dean Borup ###-#### ###-#### a/c disconnect box C/N left 7 items. 7/24/00 1:27:28 PM
|
BLD00-01086
| BLD-Foundation | 7/21/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | PART |
|
|
Jack ###-#### Already poured- note: Carl looked at some of the rebar late on 7/21/00 ok 7/25/00 9:36:50 AM
|
BLD99-03738
| BLD-Final | 7/24/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/24/2000 at 07:17:05. Contact: ###-####. Not ready 7/24/00 1:27:33 PM
|
BLD00-00761
| BLD-Final | 7/24/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/24/2000 at 07:18:51. Contact: ###-####. Change order for temp. glass by entry- verified order C of C issued #19734 7/25/00 9:36:29 AM
|
BLD00-01871
| BLD-Framing/Rough-in | 7/14/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-02072
| BLD-Footing | 7/21/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | PART |
|
|
Frank ###-#### Ok 7/24/00 1:26:44 PM
|
BLD99-03122
| BLD-Foundation | 7/21/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 07/21/2000 at 11:48:28. Contact: . Work in progress/ok 7/24/00 1:26:39 PM
|
BLD00-00794
| BLD-Framing/Rough-in | 7/21/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | FAIL |
|
|
###-#### mark C/N not done all the way/conference with builder. 7/24/00 1:27:18 PM
|
BLD00-00492
| BLD-Final | 7/21/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | FAIL |
|
|
###-#### call first need proof of plumbing sign off- all else ok. 7/24/00 1:27:04 PM
|
BLD00-00668
| BLD-Framing/Rough-in | 7/21/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/21/2000 at 14:09:12. Contact: ###-####. Need engineer fix on fire walls- hold downs and breaks in firewall for plumbing. 7/24/00 1:26:29 PM
|
BLD00-01180
| BLD-Footing | 7/21/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | P | FAIL |
|
|
todd--###-#### ft Not ready chech depth on point load 14" 7/25/00 9:35:39 AM
|
BLD00-00593
| BLD-Final | 7/24/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/24/2000 at 07:46:24. Contact: ###-####. L.C issued. 7/25/00 9:38:23 AM
|
BLD00-01524
| BLD-Footing | 7/24/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | P | PART |
|
|
jed-- ###-#### ft Appears ok WIP 7/25/00 9:35:23 AM
|
BLD00-02119
| BLD-Footing | 7/24/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | P | PART |
|
|
###-####
|
BLD00-00682
| BLD-Energy code compliance | 7/24/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD99-03737
| BLD-Final | 7/24/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | P | PART |
|
|
Dean ###-#### 3010 is waiting for a temp. glass unit near stairs/verified order all else ok C of C #19733 issued. 7/25/00 9:34:58 AM
|
BLD00-01659
| BLD-Foundation | 7/24/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | P | PART |
|
|
###-#### Work in progress appears ok- w/verbal corrections 7/25/00 9:35:54 AM
|
BLD00-00444
| BLD-Conference | 7/24/2000 | 7/24/2000 | 7/24/2000 12:00:00 AM | P | PASS |
|
|
joel ###-#### conf insp Out side staris 7/25/00 9:35:06 AM
|