Inspections for the day of: Tuesday, July 24, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAlan Hauser
TitleMEC-COM/RES INSPECTOR
Phone #794-9453
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-01123 Rough-in7/23/20017/24/20017/24/2001 12:00:00 AMAPART
looked at subbasement, 1st,2nd floor duct and dampers in shafts, dampers in place, shaft walls not built yet, some access doors to be installed by ymc as there run duct into leased spaces 7/24/2001 11:40:40 AM
MEC01-01448 Rough-in7/23/20017/24/20017/24/2001 12:00:00 AMAPART
ok for tile ceiling and vents at 2nd flr. w/h ok 7/24/2001 10:51:25 AM
MEC01-02097 Rough-in7/23/20017/24/20017/24/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/23/2001 at 13:46:08. Contact: ###-####.
MEC01-02097 Pressure Test7/23/20017/24/20017/24/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/23/2001 at 13:46:23. Contact: ###-####.
MEC01-01644 Final7/23/20017/24/20017/24/2001 12:00:00 AMAPASS
Todd ###-#### key is above front door
MEC01-02083 Final7/24/20017/24/20017/24/2001 12:00:00 AMPNR
still in r/i stage 7/24/2001 3:39:40 PM
MEC01-02094 Final7/24/20017/24/20017/24/2001 12:00:00 AMPFAIL
doors locked, no one on site 7/24/2001 2:14:51 PM
MEC01-02148 Rough-in7/24/20017/24/20017/24/2001 12:00:00 AMPPASS
###-####
MEC01-02148 Pressure Test7/24/20017/24/20017/24/2001 12:00:00 AMPPASS
Scheduled by Inspector: 350 On 7/24/2001 3:55:32 PM
MEC01-01586 Rough-in7/23/20017/24/20017/24/2001 12:00:00 AMPPART
from front door west ok for cover 7/24/2001 3:09:14 PM
MEC01-02164 Rough-in7/23/20017/24/20017/24/2001 12:00:00 AMPFAIL
c/n posted 7/24/2001 3:39:15 PM
MEC01-02164 Pressure Test7/23/20017/24/20017/24/2001 12:00:00 AMPPASS
Todd ###-####