MEC01-01123
| Rough-in | 7/23/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | A | PART |
|
|
looked at subbasement, 1st,2nd floor duct and dampers in shafts, dampers in place, shaft walls not built yet, some access doors to be installed by ymc as there run duct into leased spaces 7/24/2001 11:40:40 AM
|
MEC01-01448
| Rough-in | 7/23/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | A | PART |
|
|
ok for tile ceiling and vents at 2nd flr. w/h ok 7/24/2001 10:51:25 AM
|
MEC01-02097
| Rough-in | 7/23/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 13:46:08. Contact: ###-####.
|
MEC01-02097
| Pressure Test | 7/23/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/23/2001 at 13:46:23. Contact: ###-####.
|
MEC01-01644
| Final | 7/23/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | A | PASS |
|
|
Todd ###-#### key is above front door
|
MEC01-02083
| Final | 7/24/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | P | NR |
|
|
still in r/i stage 7/24/2001 3:39:40 PM
|
MEC01-02094
| Final | 7/24/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | P | FAIL |
|
|
doors locked, no one on site 7/24/2001 2:14:51 PM
|
MEC01-02148
| Rough-in | 7/24/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | P | PASS |
|
|
###-####
|
MEC01-02148
| Pressure Test | 7/24/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 350 On 7/24/2001 3:55:32 PM
|
MEC01-01586
| Rough-in | 7/23/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | P | PART |
|
|
from front door west ok for cover 7/24/2001 3:09:14 PM
|
MEC01-02164
| Rough-in | 7/23/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | P | FAIL |
|
|
c/n posted 7/24/2001 3:39:15 PM
|
MEC01-02164
| Pressure Test | 7/23/2001 | 7/24/2001 | 7/24/2001 12:00:00 AM | P | PASS |
|
|
Todd ###-####
|