Inspections for the day of: Tuesday, July 24, 2001.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-01371 BLD-Aging Inspection7/24/20017/24/20017/24/2001 12:00:00 AM PART
wip 7/24/2001 7:50:00 AM
BLD01-01510 BLD-Framing/Rough-in7/23/20017/24/20017/24/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 07/23/2001 at 12:10:30. Contact: ###-####. No approved plans or address. Call for re-inspection. 7/24/2001 10:03:55 AM
BLD01-01569 BLD-Foundation7/23/20017/24/20017/24/2001 12:00:00 AMAPART
###-#### wip 7/24/2001 10:38:26 AM
BLD97-00878 BLD-Conference7/23/20017/24/20017/24/2001 12:00:00 AMADONE
###-####
BLD01-00666 BLD-Final7/23/20017/24/20017/24/2001 12:00:00 AMAPASS
###-####
MEC01-02153 Pressure Test7/23/20017/24/20017/24/2001 12:00:00 AMAPASS
###-####
BLD01-00137 BLD-Final7/24/20017/24/20017/24/2001 12:00:00 AMPPASS
###-#### please call before going out C. of C. #20464 issued. 7/24/2001 1:49:51 PM
MEC01-02169 Final7/24/20017/24/20017/24/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/24/2001 at 10:28:38. Contact: ###-####. Fireplace 7/24/2001 3:35:17 PM
BLD01-00541 BLD-Framing/Rough-in7/24/20017/24/20017/24/2001 12:00:00 AMPPASS
###-#### shear ok to side 7/24/2001 2:44:03 PM
BLD01-01510 BLD-Framing/Rough-in7/24/20017/24/20017/24/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 07/24/2001 at 11:21:22. Contact: ###-####.Shear--ok to side. 7/24/2001 3:42:21 PM
BLD01-01324 BLD-Energy code compliance7/20/20017/24/20017/24/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/20/2001 at 17:05:53. Contact: ###-####. Verbal correction--no vapor barrier on insulation at outside walls, call for re-inspection. 7/24/2001 1:39:18 PM
BLD01-01327 BLD-Final7/23/20017/24/20017/24/2001 12:00:00 AMPPASS
###-####
BLD01-01136 BLD-Framing/Rough-in7/23/20017/24/20017/24/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 07/23/2001 at 12:05:07. Contact: ###-####. C/N issued--ok to insulate. 7/24/2001 2:17:57 PM