BLD01-03127
| FIRE-Final Inspection | 7/23/2002 | 7/24/2002 | 7/24/2002 12:00:00 AM | A | PASS |
|
|
Fire life/safety finaled 7/24/2002 9:19:51 AM
|
BLD01-03128
| FIRE-Final Inspection | 7/23/2002 | 7/24/2002 | 7/24/2002 12:00:00 AM | A | PASS |
|
|
fire life/safety finaled 7/24/2002 9:20:35 AM
|
FIR02-00257
| INSP-Sprinkler Rough-in/Hydro | 7/23/2002 | 7/24/2002 | 7/24/2002 12:00:00 AM | A | FAIL |
|
|
provide fire alarm submittals to Boise City for verification of all requirements, relocate sprinkler head to 7'-6" from all walls 7/24/2002 9:07:47 AM
|
FIR01-00602
| INSP-Final Inspection | 7/23/2002 | 7/24/2002 | 7/24/2002 12:00:00 AM | P | CANC |
|
|
contractor called and said that the correct orfice is installed in the inspectors test. 7/24/2002 2:51:11 PM
|
BLD02-00937
| FIRE-Sprinkler Rough-in | 7/24/2002 | 7/24/2002 | 7/24/2002 12:00:00 AM | P | PART |
|
|
area 3C ok to cover. sprinkler head locations will still need to be verified 7/24/2002 1:35:36 PM
|
MIS02-00176
| FIR-Final | 7/24/2002 | 7/24/2002 | 7/24/2002 12:00:00 AM | P | PASS |
|
|
finaled project. told them to get the suite number installed before the structural inspection 7/24/2002 2:19:15 PM
|
BLD02-01173
| FIRE-Final Inspection | 7/24/2002 | 7/24/2002 | 7/24/2002 12:00:00 AM | P | PASS |
|
|
fire life/safety finaled
|
BLD02-01365
| FIRE-Final Inspection | 7/24/2002 | 7/24/2002 | 7/24/2002 12:00:00 AM | P | PASS |
|
|
fire life/safety finaled
|
BLD01-01527
| BLD-Conference | 7/24/2002 | 7/24/2002 | 7/24/2002 12:00:00 AM | P | DONE |
|
|
I spoke to Gabe (Hilton Garden Manager) and told him that a sign off for the swimming pool and the main building was still needed. I asked him to please call in for the swimming pool inspection within 48 hours
|