FIR06-00263
| FIR-Aging Inspection | 7/24/2006 | 7/24/2006 | 7/26/2006 10:41:46 AM | | NR |
|
|
Per Tom he is waiting for a window of opportunity to do the work.
|
FIR06-00510
| INSP-Sprinkler Rough-in | 7/24/2006 | 7/24/2006 | 7/24/2006 4:07:04 PM | P | PASS |
|
|
Underground piping is ok to cover.
|
FIR05-00693
| INSP-Sprinkler Rough-in | 7/21/2006 | 7/24/2006 | 7/24/2006 4:03:28 PM | P | PASS |
|
|
See approved plans for ceiling areas that are ok to cover.
|
FIR06-00272
| INSP-Final Inspection | 7/24/2006 | 7/24/2006 | 7/24/2006 3:56:13 PM | P | CANC |
|
|
bill ###-####
|
FIR05-00713
| INSP-Final Inspection | 7/24/2006 | 7/24/2006 | 7/24/2006 3:55:08 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 7/24/2006 at 9:26:31 AM. Contact: ###-####.
|
FIR06-00440
| INSP-Final Inspection | 7/24/2006 | 7/24/2006 | 7/24/2006 3:31:16 PM | P | FAIL |
|
|
Provide approval notes that accompany the approved plans, tenting is inadequate and needs modified in several locations, provide additional hangers on the 1 1/2" main in the west end of the basement, sidewall heads in the garage appear to be overspaced and provide as-built drawings and hydraulic calculations that include all of the piping changes and hydraulic calculation changes including the slope from the street to the riser
|
FIR06-00218
| INSP-Sprinkler Rough-in/Hydro | 7/24/2006 | 7/24/2006 | 7/24/2006 3:28:31 PM | P | PASS |
|
|
Hydro test of the FDC passed.
|
FIR06-00513
| INSP-Supply line flush | 7/24/2006 | 7/24/2006 | 7/24/2006 3:14:10 PM | P | PART |
|
|
Inspection was for supply line cover not a flush. The stubout and the first four lengths of supply piping are ok to cover.
|
BLD05-02593
| FIRE-Sprinkler Rough-in | 7/21/2006 | 7/24/2006 | 7/24/2006 3:01:26 PM | A | FAIL |
|
|
Provide approval notes that accompany the approved plans, tenting is inadequate and needs modified in several locations, provide additional hangers on the 1 1/2" main in the west end of the basement, sidewall heads in the garage appear to be overspaced and provide as-built drawings and hydraulic calculations that include all of the piping changes and hydraulic calculation changes including the slope from the street to the riser
|
FIR06-00389
| INSP-Final Inspection | 7/21/2006 | 7/24/2006 | 7/24/2006 1:36:15 PM | A | FAIL |
|
|
Ok to final when the 9th floor trouble on the facp has been fixed.
|
BLD05-02089
| FIRE-Conference | 7/21/2006 | 7/24/2006 | 7/24/2006 1:01:22 PM | A | DONE |
|
|
I went over the life safety items with Mike.
|
FIR05-00644
| INSP-Sprinkler Rough-in | 7/21/2006 | 7/24/2006 | 7/24/2006 12:33:06 PM | A | PASS |
|
|
The east half of the first floor is ok to cover. I also inspected the concealed pockets in the room entry ways and verified that they are indeed noncombustible.
|
BLD06-00531
| FIRE-Final Inspection | 7/24/2006 | 7/24/2006 | 7/24/2006 10:37:52 AM | A | PASS |
|
|
Life safety finaled
|
FIR06-00509
| INSP-Final Inspection | 7/24/2006 | 7/24/2006 | 7/24/2006 8:24:36 AM | A | FAIL |
|
|
No access and no answer at the contact phone number
|