Inspections for the day of: Tuesday, July 24, 2007.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00536 INSP-Sprinkler Rough-in7/24/20077/24/20077/24/2007 4:51:48 PMPPASS
See the city approved plans for the sprinkler piping that is ok to cover on the second floor north tower corridor.
FIR06-00011 INSP-Alarm Testing7/24/20077/24/20077/24/2007 4:50:11 PMPDONE
See the city approved plans for items in the penthouse that have been tested. The heat detectors located in the elevator equipment room need to be located at the ceiling as per NFPA 72 5.6.3.2 and the heat detectors located near the sprinklers under the obstructions shall be located under the obstructions as well.
MIS07-00153 FIR-Final7/23/20077/24/20077/24/2007 2:27:09 PMAPART
A temporary occupancy was given for the office area only. The warehouse area and use of the racks is not included. The owner is still working on getting the racking permit and the sprinkler work has been scheduled.
BLD07-00670 FIRE-Final Inspection7/23/20077/24/20077/24/2007 2:24:30 PMAPASS
fire life safety passed
BLD07-00669 FIRE-Final Inspection7/23/20077/24/20077/24/2007 2:23:55 PMAPASS
fire life safety passed.
FIR06-00708 INSP-Final Inspection7/23/20077/24/20077/24/2007 2:22:08 PMAFAIL
See the city approved plans for the items tested. Still need to perform elevator recall, provide covers and remove tape from a/v's, need as-built plans and map at facp, provide signage at the standpipe control vavles.
FIR07-00237 INSP-Final Inspection7/23/20077/24/20077/24/2007 2:18:52 PMAFAIL
See the city approved plans for location where an a/v needs to be added. Also three a/v's need to be relocated or candella increased. The interconnection between the NAC and the FACP needs tested. Also the a/v's have not been sounded yet.