Inspections for the day of: Thursday, July 24, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02837 BLD-Framing/Rough-in7/23/20087/24/20087/24/2008 4:05:28 PMPPART
Scheduled by a contractor via Hello! on 7/23/2008 at 2:39:52 PM. Contact: ###-####. I joist at roof structure in lion room ok to cover as well as hardlids in restrooms.
BLD08-00902 BLD-Wall cover7/22/20087/24/20087/24/2008 2:43:37 PMPFAIL
Shear wall inspection. Del Morton (framer- ###-####)has the structural engineer approved nailing schedule for staples. Phone #: ###-#### Internet Inspection . Request from: Daniel Appel. No approved plans on site. Noted to framer that builder needs to have approved plans on site for inspection.
BLD08-01121 BLD-Final7/23/20087/24/20087/24/2008 2:14:13 PMPPASS
Call ahead to meet at elevator please Phone #: ###-#### Internet Inspection Request from: Donovan Waldenmyer
BLD08-01121 DOC - Permit Finaled7/24/20087/24/20087/24/2008 2:14:05 PMPPASS
existing pole structure used for new equipment.
BLD08-00984 BLD-Framing/Rough-in7/24/20087/24/20087/24/2008 1:40:15 PMPPASS
mike - hard lid inspection Phone #: ###-####. hardlids for restrooms on 2nd. floor, remaining interior steel stud walls on 2nd floor were edward jones was occuping.
BLD08-00070 BLD-Footing7/23/20087/24/20087/24/2008 11:33:39 AMAPASS
James Phone #: ###-####
BLD06-02767 BLD-Final7/23/20087/24/20087/24/2008 10:42:03 AMANR
jessica Phone #: ###-#### - please call 1/2 hr prior to inspection. Needs plumbing and mech. finals first. Called and left message with Jessica.
ESC08-00618 Site Preparation7/24/20087/24/20087/24/2008 9:32:10 AMAPASS
sign posted. BMPs ok.
BLD08-01567 BLD-Footing7/23/20087/24/20087/24/2008 9:31:33 AMAPART
jEFF Phone #: ###-####. footings for new entry and rear addition only. verts not yet installed.
BLD08-01490 BLD-Framing/Rough-in7/23/20087/24/20087/24/2008 9:17:08 AMAPASS
Scheduled by a contractor via Hello! on 7/23/2008 at 10:25:52 AM. Contact: ###-####.