PLM09-01183
| Sprinkler (Final) | 7/24/2009 | 7/24/2009 | 7/24/2009 3:35:32 PM | P | PASS |
|
|
replaced dcva...............ds
|
PLM09-00832
| Final | 7/24/2009 | 7/24/2009 | 7/24/2009 3:04:38 PM | P | PASS |
|
|
If questions call Steve at ###-####. Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
PLM09-00817
| Plumbing Rough-in | 7/23/2009 | 7/24/2009 | 7/24/2009 2:34:53 PM | P | PART |
|
|
good to cover walls.......still some piping in mech room to do..........ds
|
PLM09-01177
| Plumbing Rough-in | 7/24/2009 | 7/24/2009 | 7/24/2009 1:35:05 PM | P | PASS |
|
|
Please cal Josh with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
PLM09-01177
| Plumbing Rough-in | 7/23/2009 | 7/24/2009 | 7/24/2009 12:46:33 PM | A | FAIL |
|
|
Please call Josh with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel waste and vent test failed......ds
|