BLD13-01464
| BLD-Footing | 7/24/2013 | 7/24/2013 | 7/24/2013 4:25:09 PM | P | PASS |
|
|
please call ahead for access - Dennis Phone #: ###-####
|
BLD13-01402
| BLD-Framing/Rough-in | 7/24/2013 | 7/24/2013 | 7/24/2013 4:00:09 PM | P | PART |
|
|
rick Phone #: ###-#### Conference.....
|
MIS13-00148
| BLD-Conference | 7/10/2013 | 7/24/2013 | 7/24/2013 3:21:20 PM | A | DONE |
|
|
Talked to homeowner......(female). She said that her husband met with Zoning , and Zoning gave him the requirements needed to be able to get a variance for patio cover encrouching into rear setback.
|
BLD13-00963
| BLD-Final | 7/23/2013 | 7/24/2013 | 7/24/2013 3:07:42 PM | A | PASS |
|
|
Jim call me to meet you, I have the stamped letter from the engineer you requested. Phone #: ###-#### >> Inspection requested via web by Miles Hash Final letter of approval from Axiom Engeneering signed by Preston Lee Harrison 10618.
|
BLD13-00963
| DOC - Permit Finaled | 7/24/2013 | 7/24/2013 | 7/24/2013 3:05:17 PM | P | PASS |
|
|
|
BLD13-00213
| BLD-Final | 7/23/2013 | 7/24/2013 | 7/24/2013 2:39:40 PM | P | PASS |
|
|
Please call ahead for access - mike Phone #: ###-#### OK for Perm Occ.
|
BLD13-00213
| DOC - Permit Finaled | 7/24/2013 | 7/24/2013 | 7/24/2013 2:39:14 PM | P | PASS |
|
|
|
BLD12-03320
| BLD-Framing/Rough-in | 7/23/2013 | 7/24/2013 | 7/24/2013 2:29:12 PM | P | CANC |
|
|
Rick Phone #: ###-#### Cancelled by Contr.....
|
BLD12-02376
| BLD-Final | 7/23/2013 | 7/24/2013 | 7/24/2013 1:32:57 PM | A | PASS |
|
|
Ken Phone #: ###-#### OK for Perm Occ.
|