BLD13-00808
| BLD-Final | 7/12/2013 | 7/19/2013 | | A | |
|
|
Brian Phone #: ###-####,, status review,, needs zoning
|
BLD13-00921
| BLD-Energy code compliance | 7/24/2013 | 7/24/2013 | 7/25/2013 9:37:55 AM | P | FAIL |
|
|
Jeff Phone #: ###-####
|
ESC13-00612
| Site Preparation | 7/24/2013 | 7/24/2013 | 7/25/2013 9:31:48 AM | P | PASS |
|
|
|
BLD13-01206
| BLD-Framing/Rough-in | 7/23/2013 | 7/24/2013 | 7/25/2013 7:07:07 AM | P | NR |
|
|
kevin Phone #: ###-####,, needs mech 1st
|
BLD13-01950
| BLD-Conference | 7/23/2013 | 7/24/2013 | 7/24/2013 4:16:45 PM | P | PASS |
|
|
>> Inspection requested via web by Richard Murray
|
BLD13-01712
| BLD-Energy code compliance | 7/24/2013 | 7/24/2013 | 7/24/2013 3:54:17 PM | P | PASS |
|
|
dan Phone #: ###-####
|
BLD13-01071
| BLD-Framing/Rough-in | 7/23/2013 | 7/24/2013 | 7/24/2013 2:46:47 PM | P | PART |
|
|
pj Phone #: ###-####,, need to verify seal pack,, also needs connections to existing and plate breaks
|
BLD13-00048
| BLD-Conference | 7/24/2013 | 7/24/2013 | 7/24/2013 1:49:45 PM | P | PASS |
|
|
daniel Phone #: ###-####,, frame ?
|
BLD13-01385
| BLD-Wall Bracing | 7/23/2013 | 7/24/2013 | 7/24/2013 12:40:00 PM | A | PASS |
|
|
ROLLO Phone #: ###-####
|
BLD13-01705
| BLD-Footing | 7/23/2013 | 7/24/2013 | 7/24/2013 11:49:35 AM | A | PASS |
|
|
Mana Phone #: ###-####
|
BLD13-01712
| BLD-Framing/Rough-in | 7/23/2013 | 7/24/2013 | 7/24/2013 10:48:54 AM | A | PASS |
|
|
dan Phone #: ###-####
|