Inspections for the day of: Friday, July 24, 2015.
Number of inspections: 29
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR15-00078 INSP-Final Inspection7/24/20157/24/20157/24/2015 2:50:14 PMPPASS
Permit finaled
BLD15-01513 FIRE-Final Inspection7/24/20157/24/20157/24/2015 2:43:55 PMPFAIL
The city approved plans are not complete
FIR15-00443 INSP-Final Inspection7/23/20157/24/20157/24/2015 2:43:02 PMPCANC
Was scheduled for wrong day
FIR15-00176 INSP-Final Inspection7/24/20157/24/20157/24/2015 2:13:36 PMPPART
Phase 3 sprinkler work is complete
FIR15-00436 INSP-Alarm Testing7/24/20157/24/20157/24/2015 2:00:49 PMPPASS
Phase 3 fire alarm passed
FIR15-00195 INSP-Final Inspection7/23/20157/24/20157/24/2015 1:56:17 PMAFAIL
Permit will be ok to final when as-builts are received that reflect the additional strobes. Functional testing passed
FIR15-00319 INSP-Final Inspection7/24/20157/24/20157/24/2015 1:24:15 PMPPASS
Permit finaled
FIR15-00310 INSP-Final Inspection7/24/20157/24/20157/24/2015 1:22:55 PMPPASS
Permit finaled
FIR15-00319 INSP-Supply line flush7/24/20157/24/20157/24/2015 11:29:29 AMPCANC
Wrong inspection type called in
FIR15-00437 INSP-Final Inspection7/23/20157/24/20157/24/2015 11:23:12 AMAFAIL
Supervision of the new NAC in D&B as well as functionality of audio/visuals in D&B passed. The riser gate valve tamper at the east end of D&B passed but the tamper at the west end failed. Contractor did not test flow/pressure switches on either riser in D&B. The sample tubes for the duct smoke detectors in the Grocery Warehouse need to be installed on the narrow side of the duct work or provide manometer testing to verify functionality. Hvac units will need to be tested in heat mode. Per conversation the existing manual pull station at the old panel location in D&B will be removed.
BLD15-00803 FIRE-Final Inspection7/23/20157/24/20157/24/2015 11:16:58 AMAFAIL
Previous corrections have been addressed however there are issues with the project related fire alarm permit. The life safety can be finaled when the fire alarm permit is passed.
FIR14-00757 INSP-Final Inspection7/23/20157/24/20157/24/2015 11:03:02 AMACANC
To be rescheduled for monday
FIR15-00269 INSP-Final Inspection7/23/20157/24/20157/24/2015 11:02:31 AMACANC
To be rescheduled for monday
BLD13-03585 FIRE-Final Inspection7/23/20157/24/20157/24/2015 11:01:55 AMACANC
To be rescheduled for monday
FIR14-00756 INSP-Final Inspection7/23/20157/24/20157/24/2015 10:55:59 AMACANC
To be rescheduled for monday
FIR15-00268 INSP-Final Inspection7/23/20157/24/20157/24/2015 10:52:57 AMACANC
To be rescheduled for monday
BLD14-03103 FIRE-Final Inspection7/24/20157/24/20157/24/2015 10:45:07 AMPPASS
life safety passed
FIR14-00768 INSP-Final Inspection7/23/20157/24/20157/24/2015 10:16:40 AMAPASS
permit finaled
FIR15-00271 INSP-Final Inspection7/24/20157/24/20157/24/2015 10:14:54 AMPPASS
permit finaled
FIR14-00759 INSP-Final Inspection7/23/20157/24/20157/24/2015 10:14:17 AMAPASS
permit finaled
BLD13-03587 FIRE-Final Inspection7/23/20157/24/20157/24/2015 10:13:32 AMAPASS
Life Safety Passed
FIR15-00330 INSP-Sprinkler Rough-in7/23/20157/24/20157/24/2015 10:10:01 AMAPASS
Modified pendant at the vending machine is ok to cover
FIR14-00799 INSP-Final Inspection7/23/20157/24/20157/24/2015 10:04:40 AMAFAIL
No access to room because of flooring and many of the sprinkler heads still had protection on them by painters. No inspection completed.
FIR15-00280 INSP-Final Inspection7/23/20157/24/20157/24/2015 9:11:35 AMAPASS
permit finaled
BLD13-03596 FIRE-Final Inspection7/23/20157/24/20157/24/2015 9:10:38 AMAPASS
Life Safety Passed
FIR14-00758 INSP-Final Inspection7/23/20157/24/20157/24/2015 9:07:19 AMAPASS
permit finaled
FIR15-00270 INSP-Final Inspection7/23/20157/24/20157/24/2015 9:06:15 AMAPASS
permit finaled
BLD13-03586 FIRE-Final Inspection7/23/20157/24/20157/24/2015 9:05:07 AMAPASS
Life Safety Passed
FIR15-00499 INSP-Final Inspection7/23/20157/24/20157/24/2015 7:51:38 AMAPASS
permit finaled