BLD15-02392
| BLD-Framing/Rough-in | 7/23/2015 | 7/24/2015 | 7/24/2015 4:06:46 PM | P | PASS |
|
|
would like call ahead for access; Elliot Phone #: ###-####
|
BLD15-00736
| BLD-Framing/Rough-in | 7/24/2015 | 7/24/2015 | 7/24/2015 3:33:40 PM | P | PART |
|
|
Steve Phone #: ###-#### Strapping on portal frame garage need strapping over plumbing on the top plate on stair wall. OK to insulate. CN posted
|
BLD15-00803
| BLD-Final | 7/23/2015 | 7/24/2015 | 7/24/2015 3:03:12 PM | P | NR |
|
|
Dan Phone #: ###-####
|
BLD15-01598
| BLD-Wall Bracing | 7/23/2015 | 7/24/2015 | 7/24/2015 3:03:11 PM | P | PASS |
|
|
Jeremy Phone #: ###-####
|
BLD15-00662
| BLD-Energy code compliance | 7/24/2015 | 7/24/2015 | 7/24/2015 2:02:07 PM | P | PASS |
|
|
|
BLD15-00662
| BLD-Framing/Rough-in | 7/24/2015 | 7/24/2015 | 7/24/2015 2:01:52 PM | P | PASS |
|
|
|
BLD15-01279
| BLD-Final | 7/23/2015 | 7/24/2015 | 7/24/2015 11:38:41 AM | A | NR |
|
|
Marian-please do inspection after 9:00 Phone #: ###-####
|
BLD15-01087
| BLD-Footing | 7/23/2015 | 7/24/2015 | 7/24/2015 11:37:43 AM | A | PASS |
|
|
Inspection request time 11:00 Phone #: ###-#### Inspection requested via web by tony L
|
BLD15-00778
| BLD-Framing/Rough-in | 7/22/2015 | 7/24/2015 | 7/24/2015 10:59:14 AM | A | FAIL |
|
|
Kris Phone #: ###-####. Header over sliding door wrong size header per aproved plans. Air seal.
|
BLD15-01425
| BLD-Conference | 7/23/2015 | 7/24/2015 | 7/24/2015 10:09:27 AM | A | DONE |
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by John Saucerman
|
BLD15-01425
| BLD-Framing/Rough-in | 7/24/2015 | 7/24/2015 | 7/24/2015 10:08:58 AM | P | PASS |
|
|
Framing inspection Phone #: ###-#### Inspection requested via web by John Saucerman
|