Inspections for the day of: Tuesday, July 24, 2018.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-02683 Electrical Rough-In7/24/20187/24/20187/24/2018 2:18:27 PMPPASS
Corbin ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg
Up bathrooms only rough in ok cover
ELE17-02183 Final7/24/20187/24/20187/24/2018 1:58:29 PMPFAIL
Call Mike with questions, he should be at the house. Phone #: ###-#### Inspection requested via web by Bonnie Page
210.8- Receptacles located with in 6' of kitchen sink shall have GFCI protection.
210.8- Receptacles located in bathrooms shall have GFCI protection, up bath stool.
314.25- All boxes shall have covers in place.
408.4- Panels circuit directories shall be complete.
ELE18-02011 Final7/23/20187/24/20187/24/2018 12:04:15 PMAPASS
Please call Lynn prior to arrival. Thank you! Phone #: ###-#### Inspection requested via web by Lynn Proctor
No card posted. Final ok
ELE18-02790 Conference7/23/20187/24/20187/24/2018 10:34:21 AMADONE
We will be on site all day. Phone #: ###-#### Inspection requested via web by Casey Fouts
Discussed clearance requirements for electric service from a gas meter. As per notes on Idaho Power website a minimum of 36" distance in all directions from gas meter. Once 36" is done a horizontal distance of 18" shall be satisfied.
ELE18-02007 Final7/23/20187/24/20187/24/2018 9:56:23 AMAFAIL
No one on site. Homeowner and general contractor know you will be coming. Call with any questions. Phone #: ###-#### Inspection requested via web by Garrett Collins
410.16- Luminaire located in closet shall have a totally enclosed lamp.
ELE18-02792 Conference7/23/20187/24/20187/24/2018 9:38:04 AMADONE
We were quoted for the electrical work by our contractor''s electrician and decided to try and save money by doing it ourselves. We had already roughed in a portion and completed the pendant lights when our contractor saw what we were doing and asked if we had pulled our permit. We didn''t realize we needed one! So we stopped what we were doing, cleaned up the mess, and filed our permit and would like guidance to ensure we are in compliance with the law. Phone #: ###-#### Inspection requested via web by Michael Hobson
Discussed wiring of addition, minimum receptacle locations, boxfill, amount of wire in a box, type of receptacles, outdoor receptacle needed, listing of materials. Inspection process. Pamphlet given.
ELE18-02791 Electrical Rough-In7/23/20187/24/20187/24/2018 9:05:19 AMAPASS
2nd floor bathrooms, are ready for rough in inspection. Bathrooms are open and can be inspected any time. I am not on site, but call with any needed info. Kurt ###-#### Phone #: ###-#### Inspection
requested via web by Kurt Carlson
Bathrooms Rough in ok cover