FIR13-00616
| FIR-Aging Inspection | 7/24/2018 | 7/24/2018 | 8/1/2018 1:37:05 PM | | DONE |
|
|
Final inspection was completed on 11/15/2013
|
BLD17-03435
| FIRE-Final Inspection | 7/24/2018 | 7/24/2018 | 7/24/2018 1:23:28 PM | P | PASS |
|
|
Fire sprinkler inspection complete, no fire alarm modifications, fire extinguisher will be placed in discussed location. Final life fire safety inspection for area of work complete.
Nate Phone #: ###-####
|
FIR16-00563
| INSP-Sprinkler Rough-in | 7/24/2018 | 7/24/2018 | 7/24/2018 1:22:22 PM | P | PART |
|
|
Rough to cover inspection for uderground supply complete, approved for cover.
|
BLD18-00968
| FIRE-Final Inspection | 7/24/2018 | 7/24/2018 | 7/24/2018 11:44:33 AM | P | FAIL |
|
|
Fire alarm work/permit needs to be completed before life fire safety can be completed.
Zac Phone #: ###-####
|
BLD17-04217
| FIRE-Final Inspection | 7/24/2018 | 7/24/2018 | 7/24/2018 11:43:52 AM | P | FAIL |
|
|
Fire alarm permit needs to be finaled befoe life fire safety inspection can be completed.
Zac Phone #: ###-####
|
BLD16-03292
| FIRE-Final Inspection | 7/23/2018 | 7/24/2018 | 7/24/2018 10:28:29 AM | A | PASS |
|
|
Final life fire safety inspection complete.
Jeff Phone #: ###-####
|
FIR18-00492
| INSP-Final Inspection | 7/23/2018 | 7/24/2018 | 7/24/2018 9:31:24 AM | A | PASS |
|
|
Final fire sprinkler inspection for area of work complete.
Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-01269
| FIRE-Final Inspection | 7/23/2018 | 7/24/2018 | 7/24/2018 9:30:46 AM | A | PART |
|
|
Final life fire safety inspection for restroom remodel on levls 2, 3 and 10 complete, level 12 to be completed at a later date.
Zach Phone #: ###-####
|
FIR18-00027
| INSP-Sprinkler Rough-in | 7/24/2018 | 7/24/2018 | 7/24/2018 9:14:00 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping complete for buidling B levels 1, 2 and 3. General contractor needs to provide documentation for foam sheet insulation rating of installed an the deck, a minimum of R-38 is required for freeze protection on level 3, cover is approved at general contractors risk, if sheeting is not R-38 rated then any cover material over fire sprinkler piping will need to be removed and a R-38 or higher rating will need to be installed. Cover is approved for building A for overhead fire sprinkler piping.
|
FIR18-00027
| INSP-Sprinkler Rough-in/Hydro | 7/23/2018 | 7/24/2018 | 7/24/2018 9:07:49 AM | A | DONE |
|
|
Hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauges.
RANDY IS OUR FOREMAN Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|