Inspections for the day of: Friday, July 24, 2020.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-01434 Final7/23/20207/24/20207/24/2020 2:39:41 PMAPASS
Dustin Kinsey (electrician) is the contact for any questions. Thank you Phone #: ###-#### Inspection requested via web by A.M.E. Office Ok final.
ELE20-01372 Electrical Rough-In7/21/20207/24/20207/24/2020 1:42:51 PMPPASS
Wall inspection for basement. Call Chase Wangen if questions. Phone #: ###-#### Inspection requested via web by Shane Dale Ok cover basement
ELE20-02486 Final7/23/20207/24/20207/24/2020 12:39:36 PMAPASS
Installed stack switch and cover plate. I have photos of the switch and the light fixtures being turned on Phone #: ###-#### Inspection requested via web by Troy Cobb Ok final. Received pics from contractor, lights working after new stack switch installed. Could not physically do inspection due to Covid-19 as house is occupied.
ELE20-00468 Electrical Rough-In7/23/20207/24/20207/24/2020 10:34:50 AMAPASS
Enter property thru driveway and walk towards back of home near the pool.
electrical rough in inspection for outdoor kitchen. Four Countertop outlets provided in back splash of bar areas and receptacles in cabinets for kitchen appliances with cord ends. All appliance outlets and countertop outlets will be gfci protected from panel. Phone #: ###-#### Inspection requested via web by Kurt Carlson Ok cover outdoor kitchen
ELE20-02099 Permanent Service7/23/20207/24/20207/24/2020 10:34:26 AMACANC
The disconnect on the crosswalk traffic pole on the NW side of Granger and Cloverdale is ready for inspecton. Phone #: ###-#### Inspection requested via web by Joe McLean Awaiting decision on GES. Pole is 10ft in ground and being used as grounding electrode. 250.66 states sizing for GEC. Ground rod may be needed
ELE20-02275 Permanent Service7/23/20207/24/20207/24/2020 10:32:34 AMACANC
The disconnect at the crosswalk traffic pole south of the intersection of Five Mile and Granger on West side of Five Mile needs inspected for permanent service. Please call Joe with any issues. ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean Awaiting decision on GES. Pole is 10ft in ground and is being used as grounding electrode. GEC will need to be sized as per 250.66 or ground rod installed