Inspections for the day of: Friday, July 24, 2020.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE20-02329 Electrical Rough-In7/24/20207/24/20207/24/2020 2:20:02 PMPPASS
*Screened* Jenn Phone #: Call ahead for access ###-####...

rough in ok to cover
ELE20-02329 Conference7/24/20207/24/20207/24/2020 2:19:42 PMPPASS
*Screened* Jenn Phone #: Call ahead for access ###-####...
discussed wiring of shop...sch80 requirement...grounding...GFCI protection...competent in work
ELE20-02325 Final7/21/20207/24/20207/24/2020 1:35:48 PMPPASS
Electrician: Jeff ###-####
Homeowner: Brian Pete ###-####
Phone #: ###-#### Inspection requested via web by Same Electric...
panel complete, circuits on and GFCI protected...ok to final
ELE17-03273 Final7/24/20207/24/20207/24/2020 12:38:08 PMPPASS
owner said condit in back covered with paveor concrete Phone #: ###-#### Inspection requested via web by ron spen cer...

as per COVID19 occupied house inspection done by verification by electrical contractor ...corrections made and conduit covered by pavers
ELE20-02420 Electrical Rough-In7/24/20207/24/20207/24/2020 12:21:55 PMPPASS
Will call at 12 to schedule a time to meet you onsite to look at a panels Phone #: ###-#### Inspection requested via web by Jesse Simpson...
UL listings verified...breaker inside...will need access for final...waiting on panel cover-ordered...electrician needs to pull permit
ELE20-01001 Final7/24/20207/24/20207/24/2020 11:54:44 AMPPASS
Mike Bourland is the contact for todays inspection Phone #: ###-#### Inspection requested via web by Melinda Aubrey...
complete, pit verified, elevator rm...ok to final
ELE19-03639 Final7/23/20207/24/20207/24/2020 11:22:05 AMAPART
partial final
3rd floor 12 units IF POSSIBLE :)
If not please inspect as many as possible.
Please call Todd to discuss. and have a great Friday! Phone #: ###-#### Inspection requested via web by Todd Hall...

3rd floor units...ok for final
ELE20-02578 Electrical Rough-In7/23/20207/24/20207/24/2020 11:12:14 AMAPASS
pool bonding Phone #: ###-#### Inspection requested via web by Lee VanSchoiack...

Pool Bonding
4 corners, LED lights, rail sundeck, hot tub to pool
Hot Tub
4 corners, rail, back to equipment
ELE20-02570 Final7/23/20207/24/20207/24/2020 9:43:56 AMAPASS
Phone #: ###-#### Inspection requested via web by Susan Echols...complete...ok to final
ELE20-02308 Permanent Service7/23/20207/24/20207/24/2020 8:45:54 AMAFAIL
The disconnect at the crosswalk traffic pole on the intersection of Fairview ; Allumbaugh is ready for inspection. Shallow PVC conduit was replaced with Rigid due to concrete obstruction. Please call Joe with issues. ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean...

1) service grounding required...discussed with Boise electrical inspectors...code violation found on 2nd inspection after getting padlock code and had access
MIS20-00129 ELE-Conference6/30/20207/24/20207/24/2020 8:25:10 AMADONE
check for permit...verify occupency of building...
due to COVID19 no occupency in building