ELE20-02329
| Electrical Rough-In | 7/24/2020 | 7/24/2020 | 7/24/2020 2:20:02 PM | P | PASS |
|
|
*Screened* Jenn Phone #: Call ahead for access ###-####...
rough in ok to cover
|
ELE20-02329
| Conference | 7/24/2020 | 7/24/2020 | 7/24/2020 2:19:42 PM | P | PASS |
|
|
*Screened* Jenn Phone #: Call ahead for access ###-####... discussed wiring of shop...sch80 requirement...grounding...GFCI protection...competent in work
|
ELE20-02325
| Final | 7/21/2020 | 7/24/2020 | 7/24/2020 1:35:48 PM | P | PASS |
|
|
Electrician: Jeff ###-#### Homeowner: Brian Pete ###-#### Phone #: ###-#### Inspection requested via web by Same Electric... panel complete, circuits on and GFCI protected...ok to final
|
ELE17-03273
| Final | 7/24/2020 | 7/24/2020 | 7/24/2020 12:38:08 PM | P | PASS |
|
|
owner said condit in back covered with paveor concrete Phone #: ###-#### Inspection requested via web by ron spen cer...
as per COVID19 occupied house inspection done by verification by electrical contractor ...corrections made and conduit covered by pavers
|
ELE20-02420
| Electrical Rough-In | 7/24/2020 | 7/24/2020 | 7/24/2020 12:21:55 PM | P | PASS |
|
|
Will call at 12 to schedule a time to meet you onsite to look at a panels Phone #: ###-#### Inspection requested via web by Jesse Simpson... UL listings verified...breaker inside...will need access for final...waiting on panel cover-ordered...electrician needs to pull permit
|
ELE20-01001
| Final | 7/24/2020 | 7/24/2020 | 7/24/2020 11:54:44 AM | P | PASS |
|
|
Mike Bourland is the contact for todays inspection Phone #: ###-#### Inspection requested via web by Melinda Aubrey... complete, pit verified, elevator rm...ok to final
|
ELE19-03639
| Final | 7/23/2020 | 7/24/2020 | 7/24/2020 11:22:05 AM | A | PART |
|
|
partial final 3rd floor 12 units IF POSSIBLE :) If not please inspect as many as possible. Please call Todd to discuss. and have a great Friday! Phone #: ###-#### Inspection requested via web by Todd Hall...
3rd floor units...ok for final
|
ELE20-02578
| Electrical Rough-In | 7/23/2020 | 7/24/2020 | 7/24/2020 11:12:14 AM | A | PASS |
|
|
pool bonding Phone #: ###-#### Inspection requested via web by Lee VanSchoiack...
Pool Bonding 4 corners, LED lights, rail sundeck, hot tub to pool Hot Tub 4 corners, rail, back to equipment
|
ELE20-02570
| Final | 7/23/2020 | 7/24/2020 | 7/24/2020 9:43:56 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Susan Echols...complete...ok to final
|
ELE20-02308
| Permanent Service | 7/23/2020 | 7/24/2020 | 7/24/2020 8:45:54 AM | A | FAIL |
|
|
The disconnect at the crosswalk traffic pole on the intersection of Fairview ; Allumbaugh is ready for inspection. Shallow PVC conduit was replaced with Rigid due to concrete obstruction. Please call Joe with issues. ###-####. Phone #: ###-#### Inspection requested via web by Joe McLean...
1) service grounding required...discussed with Boise electrical inspectors...code violation found on 2nd inspection after getting padlock code and had access
|
MIS20-00129
| ELE-Conference | 6/30/2020 | 7/24/2020 | 7/24/2020 8:25:10 AM | A | DONE |
|
|
check for permit...verify occupency of building... due to COVID19 no occupency in building
|