Inspections for the day of: Thursday, July 25, 1996.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD96-00664 INSP - Energy code compliance7/25/19967/25/19967/25/1996 12:00:00 AM PASS
/ / 301 - INSL-OK INSULATION-ENERGY CODE
BLD96-00664 INSP - Framing/Rough-in7/24/19967/25/19967/25/1996 12:00:00 AMAPASS
07/25/96 301 - FRAME REINSPECT FRAM-OK FRAMING
BLD96-00700 INSP - Framing/Rough-in7/24/19967/25/19967/25/1996 12:00:00 AMAFAIL
07/25/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
BLD96-00723 INSP - Footings7/24/19967/25/19967/25/1996 12:00:00 AMAPASS
07/25/96 301 - EAR-EARLY START POURED WITHOUT INSPECTION STBK-OK SETBACKS
BLD96-00892 INSP - Framing/Rough-in7/24/19967/25/19967/25/1996 12:00:00 AMAPART
07/25/96 301 - trans.to kim m.
BLD96-01258 INSP - Framing/Rough-in7/24/19967/25/19967/25/1996 12:00:00 AMAPASS
07/25/96 301 - FRAM-OK FRAMING pending mech ok to insulate.
BLD96-00275 INSP - Ceiling grid7/24/19967/25/19967/25/1996 12:00:00 AMAPART
07/25/96 301 - trans to bob a. Not complete perimeter wires and spacer bars required, will check at final.
BLD96-01273 INSP - Framing/Rough-in7/24/19967/25/19967/25/1996 12:00:00 AMAPASS
07/25/96 301 - conf ok to insulate
BLD96-01647 INSP - Framing/Rough-in7/24/19967/25/19967/25/1996 12:00:00 AMAPASS
07/25/96 301 - WALLS FRAM-OK FRAMING WFR -OK WALL FRAMING
BLD96-01767 INSP - Foundation7/25/19967/25/19967/25/1996 12:00:00 AMPPART
07/25/96 301 - EARLY START EAR-EARLY START POURED WITHOUT INSPECTION
BLD96-01353 INSP - Swimming pool7/25/19967/25/19967/25/1996 12:00:00 AMPPASS
07/25/96 301 - FRMS-OK FORMS-REBAR
BLD96-00485 INSP - Footings7/25/19967/25/19967/25/1996 12:00:00 AMPPART
07/25/96 301 - trans to kim.m
BLD96-01273 INSP - Framing/Rough-in7/25/19967/25/19967/25/1996 12:00:00 AMPPART
07/25/96 301 - FRAME REINSPECTION