PLM96-02165
| INSP - Sewer line | 7/25/1996 | 7/25/1996 | 7/26/1996 12:00:00 AM | P | CANC |
|
|
07/26/96 347 -
|
PLM96-02148
| INSP - Sprinkler & Backflow | 7/25/1996 | 7/25/1996 | 7/25/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - SP. O/K 7/25/6 347
|
PLM96-02152
| INSP - Plumbing Rough-in | 7/24/1996 | 7/25/1996 | 7/25/1996 12:00:00 AM | A | PASS |
|
|
07/25/96 347 - READY AT 11:00 W/C 2 BASIN 2 TUB 2 SINK 2 W/H 2 W/B 2 R/I O/K 7/25/6 347
|
PLM96-02158
| INSP - Sprinkler & Backflow | 7/24/1996 | 7/25/1996 | 7/25/1996 12:00:00 AM | A | FAIL |
|
|
07/25/96 347 - TWO UNIONS REQUIRED WHEN WITHIN 12" OF A STRUCTURE 7/25/6
|
PLM96-02161
| INSP - Plumbing Rough-in | 7/24/1996 | 7/25/1996 | 7/25/1996 12:00:00 AM | A | PASS |
|
|
07/25/96 347 - W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 O/K 7/25/6 3
|
PLM96-02162
| INSP - Plumbing Rough-in | 7/24/1996 | 7/25/1996 | 7/25/1996 12:00:00 AM | A | FAIL |
|
|
07/25/96 347 - W/C 2 BASIN 2 TUB 1 SHR 1 SINK 1 W/B 1 W/H 1 O/K 7/25/6 3 WASTE TEST FAILED
|
PLM96-02163
| INSP - Plumbing Rough-in | 7/24/1996 | 7/25/1996 | 7/25/1996 12:00:00 AM | A | PASS |
|
|
07/25/96 347 - wc-2 lav-3 ts-2 ks-1 wh-1 cw-1 CORRECT COUNT 7/25/6 347
|