ELE00-02264
| Rough-In Permanent Service | 7/24/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | P | PASS |
|
|
###-#### P/S O/H REc called to IP talked to 7/26/00 10:46:22 AM
|
ELE00-01772
| Final | 7/25/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 07/25/2000 at 08:18:37. Contact: ###-####. a/c installed Conferecnce 7/26/00 10:45:42 AM
|
ELE00-02756
| Electrical Rough-In | 7/25/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | P | PART |
|
|
###-####--LARRY--GROUND WORK FOR POOL--PLEASE CALL 15 MIN BEFORE INSP 15' from service to covered with cement 7/26/00 10:46:34 AM
|
ELE00-02522
| Permanent Service | 7/25/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | P | PASS |
|
|
CRAIG--- ###-#### PER SER P/S O/H new- tie drop on 2" ridged. 7/26/00 10:46:03 AM
|
ELE00-01863
| Final | 7/25/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | P | PART |
|
|
conference 2:30 pm
Conf. 7/26/00 10:45:35 AM
|