PLM00-02269
| Final | 7/21/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 330 On 7/21/2000 1320 vista 4663707 7/21/2000 10:38:25 AM avb required on spray hoses at shampoo sinks, temp occ ok 7/25/2000 10:27:24 AM
|
PLM00-02270
| Final | 7/21/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by Inspector: 330 On 7/21/2000 1330 vista 4663707 7/21/2000 10:38:40 AM
7/24/2000 9:46:33 AM not complete not even any rockup 7/25/2000 10:28:14 AM
|
PLM00-02595
| Water and/or Sewer | 7/24/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | A | PASS |
|
|
carla--- ###-#### swr line only
|
PLM00-02605
| Sprinkler (Final) | 7/25/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | P | PASS |
|
|
###-#### late pm
|
PLM00-02493
| Plumbing Rough-in | 7/25/2000 | 7/25/2000 | 7/25/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/25/2000 at 11:19:17. Contact: ###-####. incomplet 7/25/2000 4:12:06 PM e 7/25/2000 4:12:08 PM
|