FIR00-00430
| INSP-Sprinkler Rough-in | 7/24/2001 | 7/25/2001 | 7/25/2001 12:00:00 AM | A | PART |
|
|
OK on rough in of 2nd floor with 3 corrections 7/25/2001 10:28:34 AM
|
FIR01-00340
| INSP-Sprinkler Rough-in/Hydro | 7/24/2001 | 7/25/2001 | 7/25/2001 12:00:00 AM | A | PART |
|
|
OK on spklr rough in add earthquake bracing and change two hangers 7/25/2001 2:17:08 PM
|
FIR01-00122
| INSP-Sprinkler Rough-in/Hydro | 7/24/2001 | 7/25/2001 | 7/25/2001 12:00:00 AM | A | PART |
|
|
OK spklr rough in and hydro test . 7/24/2001 4:38:21 PM
|
FIR01-00385
| INSP-Sprinkler Rough-in/Hydro | 7/24/2001 | 7/25/2001 | 7/25/2001 12:00:00 AM | A | FAIL |
|
|
Spklr rough on new showroom and service area. Draft stops , sway bracing, add one head, combustible concealed space 7/25/2001 12:17:30 PM
|
BLD00-02809
| FIRE-Final Inspection | 7/25/2001 | 7/25/2001 | 7/25/2001 12:00:00 AM | P | PASS |
|
|
###-#### Reinsp OK for temp Occ 7/25/2001 3:10:52 PM Move FDC Monitor Contr vlvs on back flow 7/25/2001 3:11:41 PM
|
FIR01-00340
| INSP-Final Inspection | 7/24/2001 | 7/25/2001 | 7/25/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 07/24/2001 at 13:59:18. Contact: ###-####.
|